- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
RULES FOR BUILDING AND CLASSING STEEL VESSELS FOR SERVICE ON RIVERS AND INTRACOASTAL WATERWAYS 2007 NOTICE NO. 3 – November 2007 The following Rule Change was approved by the ABS Classification Committee on 27 September 2007 with the implementation date; EFFECTIVE AS OF 1 OCTOBER 2007. (See /rules/downloads.html for the consolidated version of the Rules for Building and Classing Steel Vessels for Service on Rivers and Intracoastal Waterways 2007, with all Notices and Corrigenda incorporated.) Notes - The date in the parentheses means the date that the Rule becomes effective for new construction based on the contract date for construction, unless otherwise noted. (See 1-1-4/3.3.) PART 1 CONDITIONS OF CLASSIFICATION CHAPTER 1 SCOPE AND CONDITIONS OF CLASSIFICATION SECTION 2 SUSPENSION AND CANCELLATION OF CLASSIFICATION (Delete 1-1-2/7.5i) and renumber 1-1-2/7.5ii) through iv) as follows :) 7.5 (1 October 2007) Class will be suspended and the Certificate of Classification will become invalid in any of the following circumstances: i) If Continuous Survey items which are due or overdue at the time of Annual Survey are not completed and no extension has been granted, ii) If the other surveys required for maintenance of class, other than Annual, Intermediate or Special Periodical Surveys, are not carried out by the due date and no Rule allowed extension has been granted, or iii) If any damage, failure or deterioration repair has not been completed as recommended. (Add new Paragraph 1-1-2/7.6) 7.6 (1 October 2007) Class will be subject to a suspension procedure if recommendations issued by the Surveyor are not carried out by their due dates and no extension has been granted. ABS RU
您可能关注的文档
- 美国船级社标准ABS RCN 7.pdf
- 美国船级社标准ABS RCN 9.pdf
- 美国船级社标准ABS RCN1 Steel Vessels for Service on Rivers and Intracoastal Waterways.pdf
- 美国船级社标准ABS RCN2 Steel Vessels for Service on Rivers and Intracoastal Waterways.pdf
- 美国船级社标准ABS RCN4 Steel Vessels for Service on Rivers and Intracoastal Waterways.pdf
- 美国船级社标准ABS RCN5 Steel Vessels for Service on Rivers and Intracoastal Waterways.pdf
- 美国船级社标准ABS RCN6 Steel Vessels for Service on Rivers and Intracoastal Waterways.pdf
- 美国船级社标准ABS Steel Vessels Under 90 Meters (295 Feet) in Length RCN 1.pdf
- 美国船级社标准ABS Steel Vessels Under 90 Meters (295 Feet) in Length RCN 2.pdf
- 美国船级社标准ABS Steel Vessels Under 90 Meters (295 Feet) in Length RCN 3.pdf
- 美国船级社标准ABS Steel Vessels Under 90 Meters (295 Feet) in Length RCN 4.pdf
- 美国船级社标准ABS Steel Vessels Under 90 Meters (295 Feet) in Length RCN 5.pdf
- 美国船级社标准ABS Steel Vessels Under 90 Meters (295 Feet) in Length RCN 6.pdf
- 美国船级社标准ABS Steel Vessels Under 90 Meters (295 Feet) in Length RCN 7.pdf
有哪些信誉好的足球投注网站
文档评论(0)