水利水电建设与生态环境保护.ppt

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
NEW DAMS In last 5 years 55 new dams completed or under construction including: Seven Oaks Dam, California 193 m Olivenhain Dam, California 97m Hunting Run Dam, Virginia 38m DECOMMISSIONING OF DAMS Total dams decommissioned (1946 to present): 467 State Number Highest (m) Average Height (m) California 48 17.1 4.6 Wisconson 73 17.7 3.0 Connecticut 16 7.9 3.4 Ohio 38 12.2 5.8 Pennsylvania 38 9.1 2.7 Tennessee 26 48.8* 14.3* Illinois 17 29.3 7.9 *Owned and removed by mining companies DECOMMISSIONING DAMS EXAMPLE OF A SMALL DAM: Finlayson DECOMMISSIONING DAMS EXAMPLE OF A SMALL DAM: Finlayson Issues: River restoration versus Sediment management Status: Completed river restoration Solution: Sedimentation issues avoided by use of sedimentation trap Example Of Large Dams Under Discussion US Corps Of Engineers Lower Snake River Dams LOWER SNAKE RIVER DAMS After feasibility study by US Army Corps of Engineers it was determined that: Breaching is not necessary to recover endangered species Breaching would cause high sediment movement Possible harmful effects from re-suspended contaminants Large negative economic impacts Long implementation time to breach Instead the preferred alternative is a series of structural and operational measures DECOMMISSIONING REMOVING DAMS Conclusions: Removals will continue to occur in cases where dams no longer serve their function Active debate will probably continue in several controversial cases Unlikely that “High Value” dams will be removed in foreseeable future 我国水库大坝拆(废)除情况 2003年7月1日起实施《水库降等与报废 管理办法(试行)》; 每年自然毁坝(溃决、废弃)约80座; 91-03年,共垮坝235座(小233,中2), 其中147(63%)超标洪水漫坝,71(30%) 质量差,17(7%)管理不当; 塔里木河治理拟废弃平原水库17座,改造 16座;淮河闸坝正在评估。 怒江开发与保护 怒江中下游水电规划 2003 年提交待批, 意见严重分歧; 13梯级(其中2调节 水库、1 引水式), 总装机2132万kW, 静态投资896亿元; 一期开发4个梯级。 反对开发的主要理由 保留一条“原生态河流”; 保护“三江并流”自然遗产、物种基因库 (生物多样性)、少数民族文化、独特 自然景观; 水电开发并不 能脱贫致富; ……。 主张开发的主要理由 生态环境遭受严重破坏, 经济社会发展严重滞后, 优势资源尚未开发利用: -水电开发是

文档评论(0)

a13355589 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档