- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
In the operation of high pressure heater problems and countermeasures abstract: coal-fired power plants in high-pressure heater due to work under high temperature and high pressure, so easily damaged, damage could not invest in operation with high water temperature will drop, power, this paper points out the existing high pressure heater leakage pipes and bilge mouth water distribution automatic bypass seal not beautiful, scanty water system automatically into bad and so on some common problems, analyses the causes of these problems, and puts forward corresponding countermeasures. Keywords: high pressure heater; Leak; TouRuLv; countermeasures 1. preface Steam turbine thermal heating system is adopted to improve the unit operation of the important means of economic. Back to heat heating system operation reliability and performance directly affected the height, complete unit operation of economy TouRuLv is economic indicators heater in important evaluation indexes. As coal-fired power plants to the large capacity, high parameter unit development, high pressure heater add) (hereinafter referred to as high as water supply under pressure and temperature rise accordingly; There will be in operation by the unit loads of mutation, pump failure, bypass switching caused the sudden pressure and temperature, these would give high add damage. Therefore, in addition to the high add design, manufacture and installation must ensure that quality outside, still in operation and maintenance etc, and take the necessary measures to ensure the long-term safety of operation of high added. 2. the existing problems In order to ensure the safety of coal-fired power plants ManFa, each high economic add all should is in operation. If because of the failure, should according to GaoJiaShi must be discontinued with specified high manufacturing Numbers and discontinuation of relationships, or according to the load to determine the steam extraction pressure steam turbine unit of allowable m
您可能关注的文档
- 企业信息化咨询规划方法与技术.ppt
- 企业宣传PPT实例.ppt
- 企业用工风险防范这劳务派遣风险防范.ppt
- 企业在可持续发展中存在的问题及对策.doc
- 企业战略管理案例分析集.doc
- 企业招聘简历模板.doc
- 企业诊断调查问卷.doc
- 起重基础知识.doc
- 气动冲击扳手的结构设计论文.doc
- 气动翻转机械手部件设计(含全套CAD图纸).doc
- 18.1.2分式的基本性质第1课时(分式的基本性质)(教学课件)数学人教版2024八年级上册.pptx
- 9.1社会责任我担当(教学课件)-【新教材】2025-2026学年八年级道德与法治上册同步PPT课件+教学设计.pptx
- Unit+8(单元解读课件)英语人教版八年级上册.pptx
- 串讲03+对圆的进一步认识(期中复习课件)九年级数学上学期青岛版.pptx
- 10.2+捍卫国家利益(课件)-2025-2026学年八年级道德与法治上册高效备课优质课件+教学设计(统编版2024).pptx
- 28.2.2+应用举例(第1课时+仰角俯角)(教学课件)数学人教版九年级下册.pptx
- Unit4+Section+B+2a-2e+课件2025-2026学年鲁教(五四学制)英语八年级上册.pptx
- 6.1碳单质的多样性(第一课时)课件--2025-2026学年九年级化学人教版(2024)上册.pptx
- 9.百草园到三味书屋-2025-2026学年七年级语文上册精品教学课件(统编版2024).pptx
- Unit 5 课时4 Section B(1a-1f)阅读课课件-八年级英语上册【趣味课堂】精品课件(新人教版).pptx
有哪些信誉好的足球投注网站
文档评论(0)