- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
f武理工大学《环境工程学》课程设计
武汉理工大学《环境工程学》课程设计 plates for tank lap, not fixed. Protect wires should be left in the ground and slot the compensation allowance. Metal cable trays and support and the introduction of metal cable ducts must be drawn or ground (PE) or zero (PEN) reliable and must comply with the following requirements: 1.1 metal cable trays and support full length not less than 2 in the grounding (PE) or zero (PEN) trunk connections; 1.2 non-galvanized cable bridge between both ends of the connection plates bridged copper ground wire, grounding allowed minimum cross-sectional area of not less than 4mm2; 1.3 galvanized cable bridge across both ends of the connection between the grounding wire, connect both ends of the Board not less than 2 locking nut and lock washer fixing bolts of the connection. Cable trays installed in accordance with the following provisions: 2.1 straight steel cable tray lengths not exceeding 30m, aluminum or fiberglass Cable Tray lengths over 15m with the slip joint; cable bridge spans the building set a compensation slot; 2.2 the bending radius of the cable tray bend, not less than minimum tray cable allows the turning radius, minimum bending radius of the cable shown in the table below; Table cable minimum allows bent RADIUS serial number cable type minimum allows bent radius 1 no lead Bao Gangkai nursing sets of rubber insulation power cable 10D 2 has steel armored nursing sets of rubber insulation power cable 20D 3 PVC insulation power cable 10D 4 make joint PVC insulation power cable 15D more than 5 more core control cable 10D Note: d for cable od 2.3 Dang design no requirements plates for tank lap, not fixed. Protect wires should be left in the ground and slot the compensation allowance. Metal cable trays and support and the introduction of metal cable ducts must be drawn or ground (PE) or zero (PEN) reliable and must comply with the following requirements: 1.1 metal cable trays and support full length not less than 2 in the grounding (PE) or zero (PEN)
您可能关注的文档
- fA单元7 公路工程概算的编制 公路施工组织与概预算 中职教材课件.ppt
- fA多模联动,精准定位,构建中高端户立体防挖抢体系[精品文档].ppt
- fA溧马高速60 100 60m悬臂连续梁合拢段施工方案交底.pptx
- fAAA流与高速路.pptx
- fC15细石混凝垫层及水泥砂浆找平层技术交底.doc
- family·classica经典生活-泛美兰卡设计团队介绍.ppt
- FBXW7抑制胆管癌上皮-间质转、干细胞特性及转移的作用及机制研究-外科学专业毕业论文.docx
- Fe Co基硼化物 磷化物的制备及电化学能的分析.docx
- Fe23Al复合粉体的制备及其在FeAlAl2O3复合陶瓷涂层中的应用.docx
- FClH2HD=1反应的态态动力学研究.docx
最近下载
- 译林版英语五年级上册复习课件(语法知识含部分练习).ppt VIP
- Siemens西门子家电iQ300 滚筒洗衣机 9 kg 1200 转 分钟 WB24UMZ01W 使用 安装指南_2.pdf
- 子网掩码与子网的划分.ppt VIP
- 安徽多层商业建筑工程项目冬季施工方案.doc VIP
- 潜在失效模式及后果分析(DFMEA).xls VIP
- 矿建工程监理月报.doc VIP
- 手术患者深静脉血栓的预防.pptx VIP
- 必威体育精装版国学《弟子规》ppt精品课件.pptx VIP
- 从村寺_祠堂看宗族对土族乡村社会_省略_制_基于景阳镇李氏土族的田野调查_张兴.pdf VIP
- 《金融经济学二十五讲》课后习题及答案.pdf VIP
有哪些信誉好的足球投注网站
文档评论(0)