CSF – CALCULATED SALARY FOUNDATION Indiana UniversityCSF–计算工资基础第安那大学.pptVIP

CSF – CALCULATED SALARY FOUNDATION Indiana UniversityCSF–计算工资基础第安那大学.ppt

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
CSF – CALCULATED SALARY FOUNDATION Indiana UniversityCSF–计算工资基础第安那大学

CSF What Is It? CALCULATED SALARY FOUNDATION CSF July 1 Salary (created in budget construction) July 2 the salary changed and becomes the Calculated Salary Foundation In budget construction the salary amount to be incremented is the CSF or the most updated CSF amount (eg July 2) CSF CSF is associated with positions that are active, coded Regular, with the position budget flag checked, and the CSF flag checked on the job. Regular is primarily associated with full-time employees CSF is associated with base funded positions (all fund groups) CSF HRMS e-docs For Regular position hires, terminations, transfers, maintain pay, promotions, and demotions the CSF Tracker flag should be flagged regardless of the account number The Maintain Funding e-doc is the only edoc that the CSF Tracker could be optional Examples: AC1 person in budget at $70,000/12 100% on 10-200-00 effective date is 07/01/07. Budget loads in June Oops I made an error in the salary in Budget construction – prepare Maintain Pay edoc with an effective date of July 01/07, CSF Tracker Flag must be flagged, this is TO CORRECT THE BUDGET But we also want to split the salary with another account – BE CAREFUL – prepare the Maintain Funding Edoc but the effective date should be 07/02/07 and the tracker unflagged, by unflagging for budget construction this reverts back to the original funding for budgeting purposes. This will maintain the correct salary (base) on the 10-200-00. CSF and Edocs Transferring a “Regular” employee to a different department plus a salary increase, transfer edoc is prepared and the CSF Tracker must be flagged. A faculty is $70,000/10 100% effective date is 8/01/07, if the salary has changed since budget construction the effective date of the Maintain Pay Edoc should be 8/01/07 and the CSF tracker MUST be flagged. CSF E-docs An employee’s salary is on 10-200-00 but we decide to split 50/50 with 48-200-05 the CSF Tracker must be unflagged An employee’s salary is on 10-200-00 but

您可能关注的文档

文档评论(0)

erterye + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档