- 1、本文档共20页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Synthesis Study‘Barriers to Approvals and Implementation of Investment Projec
Synthesis Study ‘Barriers to Approvals and Implementation of Investment Projects ’ Structure of the Study and the stages of research as undertaken by the PMO Presentation Structure of the synthesis study based on the inputs as received from the various case studies that have been submitted The objectives of the preliminary exercise undertaken by the PMO Key findings of the Synthesis study Prioritization of different clearances The Prime Minister’s Office has undertaken an initiative to rationalize investment procedures to ensure heightened business interest in India – from within and abroad A.T.Kearney ASSOCHAM worked together to synthesize experiences of different agencies highlight some of the key impediments and action imperatives The synthesis study, for purpose of analysis, has relied on case studies provided by leading agencies Infrastructure Development Finance Corporation A combined cycle power generation project by a private investor National Thermal Power Corporation A number of projects highlighting different issues ASSOCHAM A hydro power project by a private investor The analysis of the case studies has revealed the width and variety of downstream clearances required for getting projects off the ground to the implementation stage Our analysis of the case studies highlights four key issues with regard to downstream clearances for investments in the power sector Key Issue ? Primary resources, such as land, require clearances from multiple agencies at center, state and local level Key Issue ? Multiple clearances need to be obtained from the same agency e.g. CEA Key Issue ? Environmental clearances require disproportionate level of detail Key Issue ? Certain clearances do not appear to be serving any specified public or other interest Additionally, there is scope to simply procedures of certain clearances to reduce lead times The analysis of the cases studies reveals that Forest clearances, Land acquisition formalities and Techno Eco
您可能关注的文档
- Lon蛋白酶对线粒体蛋白的质量控制和保证及其意义.doc
- LOFT户型.doc
- LOFT诠释.doc
- LH1标 标准化施工材料03.doc
- Looking for Escape:Women and Problem Gamb.ppt
- LMX-词类活用.ppt
- Low-E低辐射镀膜玻璃.doc
- LQ-300K+II如何更改针式打印机自动切纸、自动换行等缺省设置.doc
- LP说明书.doc
- LTE中单用户多天线方案分析.doc
- 5.3.1函数的单调性(教学课件)--高中数学人教A版(2019)选择性必修第二册.pptx
- 部编版道德与法治2024三年级上册 《科技提升国力》PPT课件.pptx
- 2.7.2 抛物线的几何性质(教学课件)-高中数学人教B版(2019)选择性必修第一册.pptx
- 人教部编统编版小学六年级上册道德与法治9 知法守法 依法维权(第一课时)课件.pptx
- 三年级上册品德道德与法治《学习伴我成长》.pptx
- 部编版小学道德与法治六年级上册6 人大代表为人民 课件.pptx
- 部编版小学道德与法治六年级上册1感受生活中的法律第一课时课件.pptx
- 2.5.2圆与圆的位置关系(教学课件)-高中数学人教A版(2019)选择性必修第一册.pptx
- 2.5.1直线与圆的位置关系-(教学课件)--高中数学人教A版(2019)选择性必修第一册.pptx
- 14.1.1 同底数幂的乘法(教学课件)-初中数学人教版八年级上册.pptx
文档评论(0)