水工外文翻译渗水根源探究.docxVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水工外文翻译渗水根源探究

附录Ⅱ 外文资料及翻译 Straight to the source of seepage Jim Swaisgood, Jerry Montgomery and Val Kofoed report on the investigative work undertaken to discover the source of seepage at River Reservoir dam in the US. Water seeping through an earthen embankment suggests a number of possible circumstances, and none of them are good. At best, the reservoir owner is losing a valuable commodity. The worst case scenario is that the seepage may be the precursor of dam failure. The first step in addressing a problem with seepage is as obvious as it is difficult: pinpointing its source. In the past, procedures for determining the exact location and nature of seepage points have been both costly and time consuming. Of course, when dam failure is imminent, there is much more than money and time at stake; the efficiency and speed with which engineers can locate the source of seepage may make the difference between a timely fix and catastrophe. River Reservoir dam is an arched earthen structure on the headwaters of the Little Colorado River. It is located about 24km southwest of Eagar, Arizona, US, and is owned and operated by Round Valley Water Users Association (RVWUA). Based on very limited engineering, the dam was constructed by settlers in 1896 of local materials and without a clay core. Due to recurring sloughing problems, the dam received significant modifications on at least four separate occasions. The embankment consists of clayey soils within a rockfill shell, measuring 335m long with a maximum height of approximately 21.3m and is founded upon basalt bedrock. In 1996 additional riprap was installed to reduce the original slope of the upstream and downstream faces. A review of the early inspection reports revealed that the left abutment drain was constructed using tabular rocks to create a box-shaped opening over the rock foundation. However, the contacts between these rocks were neither sealed nor grouted. There has been much speculation regarding the original purpose of this dr

文档评论(0)

3471161553 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档