- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
suppliermanagementplan幻灯片
Supplier Quality EngineeringSupplier Management Plan Maxtor Supplier Management Supplier Qualification Design For Manufacturing (DFM) Process Management Plan (PMP) Failure Mode Effect Analysis (FMEA) Supplier Process Change Request (SPCR) Supplier Corrective Action Request (SCAR) Supplier Quality Engineering Notification (SQEN) Supplier Data Reporting Supplier Certification Flow Other Quality Requirements Maxtor Supplier Qualification Qualification plan from MLM CEB External Storage Products Supplier Qualification Procedure Supplier must be qualified to ASL020 prior to volume production Design For Manufacturing (DFM) See Mechanical Drawing Review/DFM Worksheet Supplier must perform DFM study for NEW design and whenever there is a design or drawing change involving a part / product. DFM must be submitted to SQE for review Process Management Plan (PMP) Purpose Document the process control and flow details of the supplier’s process per attached form. Establish the baseline for process change control. Establish the basis for process audit. Supplier Responsibilities Provide detail process information using Maxtor PMP format. Maintain PMP and keep information up-to-date. Not to make any changes to process without submitting Supplier Process Change Request (SPCR) and obtain approval from Maxtor. Process Management Plan (PMP) (1) Maxtor PMP Number: control number assigned by Maxtor (2) Page Number: attach additional sheets if necessary (3) Supplier: name of supplier or manufacturer (4) Part Number / Rev: relevant Maxtor P/N and applicable revision (5) Location: supplier manufacturing site and address (6) Part Description: as appeared on applicable Maxtor drawing or specification (7) PMP Rev: revision level of PMP (8) SPCR / Ref. No. : the SPCR or other documentation (e.g. EC, SCAR, OSA) that caused the PMP to revise (9) Change Description / History: detail description of changes (10) Originator: name of person who prepared the PMP. (11) Date: the date of w
您可能关注的文档
最近下载
- 山东省滕州市第二中学2024-2025学年高一上学期第一次质量检测生物试题.docx VIP
- 2024届广东省中山一中等六校高考仿真卷数学试卷含解析.doc VIP
- 关注社会:2016年重庆市最低工资标准(分别是1400元-1500元)李章虎律师整理.doc VIP
- 第1 章 脱硫技术概述.pptx VIP
- (动物传染病学课件人畜共患)36流行性乙型脑炎.ppt VIP
- 山东省滕州市第二中学2024-2025学年高一上学期10月第一次质量检测数学试卷(含解析).docx VIP
- 广告传媒公司招聘简章.pdf VIP
- 癌症防治知识讲座课件.pptx VIP
- 2007年-2019年中山大学《111单独考试思想政治理论》考研历年真题汇总.pdf VIP
- 烟气脱硫技术概述.pptx VIP
文档评论(0)