QHF6401-2008-11标准(英文版)汇.docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
QHF6401-2008-11标准(英文版)汇

Scope This standard is applicable to the requirements on painting and rust-proof of water-turbine engine, water turbine generator, steam turbine generator and their metal parts and components. This standard is applicable to product in general domestic climatic conditions or product in humid tropics or product to be exported. Normative Reference The following normative documents contain provision which, through reference in this text, constitute provisions of this national standard. For dated reference, subsequent amendments (excluding correction) to, or revisions of, any of these publications do not apply. However, parties to agreements based on this standard are encouraged to investigate the possibility of applying the most recent editions of the standards indicated below. For undated references, the latest edition of the normative document referred to applies. GB8923 Rust and antirust grades on steel surface before application of paint GB/13288 The assessment of profile grades of steel surface before application of paint (related products - Comparator) GB/T3181 Color standard for paint film ISO 14726-1 Shipping and sailing, the identify colour of pipeline system capacity main colour and medium Requirements 3.1 The supplier of work blank should clean the metal surface before paint on casting and weld assembly (primarily carry out heat treatment on blank if necessary, then clean it). After removing the oil, rust and dirt on the surface of work piece, carry out primer treatment. The rest painting should be finished in the workshop(include primer’ total thickness reach the request of table 2-1 and 2-2 ); the supplier of work finished should paint the every parts of workpiece except topcoat. 3.2 Quality management departments should verify each painting procedure strictly in accordance with specified time (except for the ones specified by contract) from relative standard (this standard included). Only when it is measured up can do the next working procedure in the wo

文档评论(0)

liwenhua11 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档