- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
外文文献翻译 () 英文原文 oduction and prevention and cure of the crack of skyscraper Rothbard M Along with the speeding of town house construction step, not a few areas with small residences set up one after another, many inhabitants move continuously into the new residence, their quality to housing request is more and more high, particularly pay attention to very much to some cracks circumstances which sprinkle building plank to appear now, worry these cracks aring end will cause insecurity trouble, but in succession to building quality direct the section hurl tell. Such as once the some city develop a company to set up 6 layers of floor residence 16 totally, constructing area about 100,000 square meters, the brick mixs structure, the beginning repairs, one steps 2 box off with the brick wall, each ones establishing a turn of beam together building plank is togetherwhole to sprinkle, the plank thick 100 mms, concrete mark number is C20, house long about with 80-90 ms, dont establish flexible sew, first floor is the 2.2 m garage layer, the C20 reinforcing bar cage of the foundation adoption infuses to note a stake.Its small areas turn to complete work in October,2003, finishing construction acceptance, didnt discover obvious crack, discover the building plank appears crack when the inhabitant repair, past jointly to quality direct the section hurl tell, through step to see on the spot, 16 houses all exist the depth different crack.The crack width is between the 0.2 mms mms-0.4ses, the great majority of the crack position is placed in plank four Capes, the dynasty sun is more obvious.Hence, the Superintendent office of quality concerned, sinking to decline quantity and inclination degree to carry on a reexamination to the house first, result all in allow the scope, again look into construction diagram paper to also match to request concerning the norm.Owing to above-mentioned circumstance, pass by hard analytical, the confirmation crack reason has the following what time: 1.
您可能关注的文档
最近下载
- 中华人民共和国人民陪审员法全文必威体育精装版解读课件.pptx VIP
- 新能源行业光储能微电网能量管理系统解决方案【50页PPT】.pptx VIP
- 电力系统分析理(第二版 刘天琪 邱晓燕)课后思考题答案(不包括计算).doc VIP
- 突发事件之车站大客流组织讲解.pptx VIP
- 护理三基考试题库7000题.pdf VIP
- 4 古代诗歌四首《次北固山下》 王湾 教学课件 初中语文统编版(2024)七年级上册 第一单元.pptx
- 电力系统分析理论-课后答案(刘天琪-邱晓燕-著)-科学出版社.pdf VIP
- 隧道工程-盾构施工技术(课件).ppt VIP
- 高速铁路隧道工程施工质量验收标准培训课件参考.ppt VIP
- 老虎岩生活垃圾填埋场沼气发电建设项目环境影响报告表.doc VIP
文档评论(0)