- 1、本文档共23页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
三峡水利枢纽工程外文文献翻译
()
文献出处: Journal of Geographical Sciences, 2013, 2(4):463-480.
英文原文 The Three Gorges Projects
HC Li, A Karl
First. The dam site and basic pivot disposal
The Three Gorges Projects is select to be fixed on San Dou Ping in Yichang, located in about 40 kilometers of the upper reaches of key water control project of Ge Zhou Ba which was built. River valley, district of dam site, is widen, slope, the two sidesof the bank is relatively gentlely. In the central plains have one island (island, fort of China,), possess the good phased construction water conservancy diversion condition. The foundation of pivot building is the hard and intact body of granite. Have built Yichang and gone to stride bridge that place of 4 kilometers in the about 28 -km-long special-purpose expressway of building site and dam low reaches --West Yangtze Bridge of imperial tomb. Have also built the quay of district of a batch of dams. The dam district possesses the good traffic condition.
Two. Important water conservancy project buildings
1. dam
The dam is a concrete gravity dam, which is 2309 meters long, it’ s height is 185 meters , the dam is 181 meters high the most. Release floodwater dam section lie riverbed, 483 of the total length, consist of 22 form hole and 23 release floodwater in the deep hole, among them deep hole is imported 90 meters , the mouth size of hole is 7*9 meters; Form hole mouth is 8 meter wide, overflow weir is 158 meters, form hole and deep hole adopt nose bank choose, flow way go on and can disappear. Dam section lies in and releases floodwater on a section of both sides of the dam in the hydropower station, there are hydropower stations that enter water mouth. Enter water mouth baseplate height 108 meters. Pressure input water pipeline for carry person who in charge of, interior diameter 12.40, adopt the armored concrete to receive the strength structure. Make and let out flow of 102500 cubic meters per second the most largely in the dam site while checki
您可能关注的文档
- 交通信号研究外文文献翻译中英文.doc
- 变电站施工建设外文系翻译中英文.doc
- 高层建筑与钢结构外文文献翻译中英文.doc
- 框架结构外文文献翻译中英文.doc
- 跨境电子商务与物流外文文献翻译中英文.doc
- 会计舞弊财务舞弊外文文献翻译.doc
- 纸浆和造纸外文文献翻译中英文.doc
- 桥梁裂缝分析外文文献翻译.doc
- 电子邮件传输协议外文文献翻译.doc
- 房地产项目可行性分析外文文献翻译.doc
- 教科版(2017秋)科学二年级上册2.6 做一顶帽子 教学设计.docx
- 河北高频考点专训四 质量守恒定律的应用教学设计---2024-2025学年九年级化学人教版(2024)上册.docx
- 大单元教学【核心素养目标】6.3 24时计时法教学设计 人教版三年级下册.docx
- 河南省商城县李集中学2023-2024学年下学期九年级历史中考模拟八(讲评教学设计).docx
- 第18章 第25课时 正方形的性质2023-2024学年八年级下册数学课时分层作业教学设计( 人教版).docx
- Module 8 模块测试 教学设计 2024-2025学年英语外研版八年级上册.docx
- 2024-2025学年小学数学五年级下册浙教版教学设计合集.docx
- 2024-2025学年小学劳动四年级下册人民版《劳动》(2022)教学设计合集.docx
- 2024-2025学年小学数学三年级上册冀教版(2024)教学设计合集.docx
- 2024-2025学年高中生物学必修1《分子与细胞》人教版教学设计合集.docx
文档评论(0)