- 1、本文档共49页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Chapter 7 Project Quality Management[精品]
* * 3.Quality Control Charts, Six Sigma, and the Seven Run Rule A control chart is a graphic display of data that illustrates the results of a process over time. It helps prevent defects and allows you to determine whether a process is in control or out of control Operating at a higher sigma value, like 6 sigma, means the product tolerance or control limits have less variability The seven run rule states that if seven data points in a row are all below the mean, above the mean, or increasing or decreasing, then the process needs to be examined for non-random problems * * Sample Quality Control Chart * * 4. Testing Many IT professionals think of testing as a stage that comes near the end of IT product development Testing should be done during almost every phase of the IT product development life cycle * * Testing Tasks in the Software Development Life Cycle * * Types of Tests A unit test is done to test each individual component (often a program) to ensure it is as defect free as possible Integration testing occurs between unit and system testing to test functionally grouped components System testing tests the entire system as one entity User acceptance testing is an independent test performed by the end user prior to accepting the delivered system * * Gantt Chart for Building Testing into a Systems Development Project Plan * * 7.8 Improving IT Project Quality * * Improving IT Project Quality Several suggestions for improving quality for IT projects include Leadership that promotes quality Understanding the cost of quality Focusing on organizational influences and workplace factors that affect quality Following maturity models to improve quality * * 1.Leadership “It is most important that top management be quality-minded. In the absence of sincere manifestation of interest at the top, little will happen below.” (Juran, 1945) A large percentage of quality problems are associated with management, not technical issues * * 2.The Cost of Quality The cost of quality is
您可能关注的文档
最近下载
- 【幼儿园】幼儿园创建“平安校园”实施方案.docx VIP
- 如何才能做到从思想上入党.pdf VIP
- 教学课件:教学设计与教案.ppt
- 浙江农村信用社招聘-2024温州乐清农商银行秋季招聘笔试备考试题及答案解析.docx
- 建筑结构施工图识读教案.pdf
- 2024小红书知识考核试题题库及答案.pdf VIP
- 青岛农业大学基础生物化学期末复习题导学资料.pdf
- 【新版教材】中学音乐人音版七年级下册《领航》课堂教学设计.docx
- 初中语文 2024年新疆乌鲁木齐市沙依巴克区中考语文适应性试卷.pdf
- HIKVISION海康威视白光全彩400万筒型网络摄像机DS-2CD3T46(D)WDV3-L.pdf
文档评论(0)