- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
半导体器件封装测试厂建设项目FM损管稽核月度报告
Project Name: International Rectifier (Xi’an) Plant
International Rectifier (Xi’an) Co., Ltd Index No: CC1324
94 Zhuque Street Account No: 1-34196
Xi’an,
Shanxi Province Date of Report: 18 March 2004
People’s Republic of China Report By: Fred Cai, Fei Long
Conference With: Mr. Qin Siliang, Deputy General Manager
Executive Summary:
Subject: Project Monthly Report No. 1 March 2004
This letter is to document the key issues of the progress of this project. Any items which we have previously agreed upon or otherwise decided will not be completed are not covered in this letter. Such items should still receive the attention agreed upon as discussed in our previous monthly reports and correspondence.
As requested by Mr. Qin, FM Global loss prevention requirements, which have been discussed in last few months, are listed in the report.Key Hazard Highlights:
Present Hazards:
Accumulations of combustible building materials, wooden forms and scaffolding, scrap lumber, paper and, plastic packing and wrappings, and other refuse appear at new locations daily. The fire danger is increased further by the presence of many ignition sources, such as hot work equipment, carelessly discarded matches or cigarettes; temporary heaters and lights etc.
The number of wind losses to buildings under construction was approximately equal to the number of fire losses. Building framing, roof covering and walls are easily blown down by moderate winds, before they are anchored or tied together. Qualified contractor should be assigned to conduct steel structure installation.
Future Hazards:
Plastic containers and packaging material used in the production area are combustible. The heat release rate can be three to five times greater for plastic material than for a similar arrangement of ordinary combustibles. In addition, burning plastics release dense corrosive smoke which can cause severe property damage in a semiconductor backend plant.
The factory will be located in the earthquake prone z
您可能关注的文档
最近下载
- 2025年北师大版高二英语新教材选择性必修二课文及翻译 .pdf VIP
- 胺碘酮抗心律失常治疗应用指南.pptx VIP
- 提升企业应急处置能力的策略.pptx VIP
- 2025届上海市中考各区二模考试物理试卷 (共12套,附答案)_可有哪些信誉好的足球投注网站.docx VIP
- 2025届上海市中考各区二模考试语文试卷 (共9套,附答案)_可有哪些信誉好的足球投注网站.docx VIP
- 2025届上海市中考各区二模考试数学试卷 (共12套,附答案).pdf VIP
- 高中地理一轮复习专题复习第18讲《流水地貌》 学案.doc VIP
- 博帕尔化学品泄漏事故案例分析.pptx VIP
- 2024年秋季七年级数学入学分班考试模拟卷02(人教版).docx VIP
- 2025届高考语文复习:分析修辞手法构成及表达效果 课件.pptx VIP
文档评论(0)