- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
phase coupling for power line communications 电力线载波
Application Note #0050
Phase Coupling for Power Line Communications
Introduction
Throughout North America, electric power distribution containing center tap transformers is provided for residential use.
This arrangement supplies “split phase” 120V/240V with three wires coming from the utility: Line ( L1, L2), and Neutral
(N). 120V power is available between L1 and N, and between L2 and N, and 240V is available between L1 and L2. At
the distribution panel of each residence, the National Electrical Code requires that a local earth ground be supplied and
connected to the neutral wire within the distribution panel. For normal 120V distribution within the house, the electrical
code requires a three wire configuration: Line, Neutral and a bare copper protective Ground ( GND). With this type of
distribution network, if two nodes on the communication bus are on opposite phases, the only direct current path between
them is through the secondary windings of the distribution transformer. At commonly used power line carrier frequencies
(i.e., 20KHz) this is an extremely poor channel, resulting in signal attenuation of 30dB or more. This combined with
other noise sources, may degrade communication performance.
CEBus Communications and the Distribution Network
When two CEBus devices are connected to the same phase of the power line, communication is straightforward because
there is a simple current path between the two devices as shown in Figure 1.
Distribution
Transformer
L1
Current Path
CEBus CEBus
您可能关注的文档
- LES06 Analyzing User Query Needs 数据仓库英文oracle99版 教学课件.ppt
- Les08-使用 SQLPlus创建友好的输出 PL-SQL讲义 课件.ppt
- Lenovo_打印其他产品培训资料2011版-0520.ppt
- LES15 Supporting End-User Access 数据仓库英文oracle99版 教学课件.ppt
- Les14 Leaving a Metadata Trail 数据仓库英文oracle99版 教学课件.ppt
- LES16 Web-Enabling the Warehouse 数据仓库英文oracle99版 教学课件.ppt
- LES13 Transportation Refreshing Warehouse Data 数据仓库英文oracle99版 教学课件.ppt
- Les20-复合数据类型的使用 PL-SQL讲义 课件.ppt
- Les17 Managing the Data Warehouse 数据仓库英文oracle99版 教学课件.ppt
- Les21-显式游标的使用 PL-SQL讲义 课件.ppt
文档评论(0)