毕业设计标书(范本)
摘 要
此毕业设计是依据济南市诚基中心21#楼的招标文件、合同条件、技术规范、图纸以及其他有关文件而编制的投标书。
设计中包括:商务标、技术标和结论。商务标包括编织的依据、范围、工程量计算过程及说明、工程造价的确定和工料分析;工程量计算规则按照《建筑工程预算》中的计算规则计算,工程造价则是应用工程造价套价软件来算,用工程量清单来报价。技术标包括工程概况、施工部署、质量目标及预控措施主要分享施工方法、工期保证措施、安全生产、消防保卫、环境保护、文明施工季节性施工技术措施、降低陈本措施。
其中商务标中的工程量计算式采用的手工计算,标书中并附有手工书写工程量计算书。在技术标中还有详细的施工步骤和工作安排,并在标书后面附有横道图、施工平面布置图,以方便对该工程全方位的认识和了解。
具体内容祥见标书。
关键词:标书;商务标;技术标;工程量;施工方案
Abstract
This graduation practice is centre 21st # floor invitation to bid documents , contract condition , technical codes , drawing sheets judge by Ji Nan City city base as well as other the relevant documents but tender weaving.
Include in design: Business affairs bid , technology bid and conclusion. The business affairs bid includes the basis weaving , range , project amounts calculate process and explanation , construction costs ascertaining that and labour and material analyse; Calculation regulation calculates amounts project calculation regulation according to hitting the target construction works budget , construction costs is that the price applying construction costs cover calculates coming the software then , uses amounts project detailed lists to do quoted price. The technology bid includes the project general situation , the deployment being under construction , mass target and charges measure for sharing the method , time limit for a project being under construction mainly ensuring that measure , safety at work, fight fire in advance defend, protect the environment , civilized the seasonal characteristic construction technology measure being under construction , this measure of lessening Chen.
The handwork that the style project amounts in business affairs bids among them is calculated adopts secretly schemes against , the bidding document is hit by and accompanies write project amounts calculating a book by hand. Still have the detailed construction step and the arrangement working in technology bid , accompany and horizontal stroke Daotu , flat surface arrangement plan being und