- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
太阳能板的安装Install and Mounting SolarPV (NXPowerLite)
Residential/Commercial Residential/Commercial RReessiiddeennttiiaall//CCoommmmeerrcciiaall Solar PV installations Solar PV installations SSoollaarr PPVV iinnssttaallllaattiioonnss Basic information and installation guides for roof mounted systems (Ed Larsen, Building Official) May-June 2008 City of Flagstaff/Project Review Section Design and Permits � A building permit is required for a Solar PV or thermal solar system. Staff has prepared a Memorandum (Memo #106; which is periodically updated) on the submittal requirements. These permits are not issued over-the-counter. � If the system is to be connected to the grid (APS utility system), then a copy of the approved interconnect agreement and a licensed contractor is required for the final installation and “green tag”. For off-grid or battery systems, a licensed contractor is not necessarily required. � If the system is not roof mounted, then the arrays must be protected from the general public. This can be done by establishing racks at eight (8) feet or greater above the ground level or by providing fencing or a skirting system around the underside of the panels to prevent contact with wiring. � Permits are not issued over the counter, but require plan review. Simplified drawings are allowed. A one line or block schematic is required and a three-line wiring diagram (indicating wiring sizes and all leads) is also required. Design and Permits - continued � There are some minor conflicts between Article 690 of the 2005 NEC and the wiring sizes for various breakers. The inverter specifications should be carefully compared to the general requirements [i.e., a PV system may only require #10s or #12 AWG wiring on the AC side and the max current (amps) may be 30 or less; however, the designer goes for the maximum size for the
您可能关注的文档
- 深安集团呼叫系统介绍与应用场合.ppt
- 客户服务礼仪培训资料.ppt
- 天然气水合物形成过程的热力学计算及一直抑制因素研究.pdf
- 语文就英法联军远征中国给巴特勒上尉的信PPT教学课件.ppt
- 瑞星全功能安全软件2010功能介绍及演示.ppt
- 巨人网游开发概述教材.ppt
- 太阳电池硅锭生产技术.pdf
- 太阳能发电峰会资料Bureau_Veritas针对光伏电子产品走向国际市场的解决方案.pdf
- 太阳能发电发展-赵玉文04.ppt
- 太阳能发电峰会资料Big_Sun_Plan.pdf
- 养老评估师中级行为面试题库及案例分析.docx
- 面试培训督导时考察其课程理解能力的题目.docx
- 税务专员面试中关于增值税政策的常见问题解答.docx
- 2025宁波市医疗保障局局属事业单位宁波市医疗保障基金管理中心招聘事业编制工作人员1人备考试题附答案.docx
- 2025咸宁市汉口银行咸宁嘉鱼支行招聘笔试历年题库附答案解析.docx
- 2025北京人才发展战略研究院招录笔试备考题库附答案.docx
- 2025四川成都市龙泉驿区青台山中学校秋季教师招聘22人笔试试题附答案解析.docx
- 2025台州市银龄讲学计划教师招募13人笔试参考试题附答案解析.docx
- 2025中国铁建公开招聘42人笔试题库附答案.docx
- 2025中智咨询研究院社会招聘笔试参考题库附答案.docx
有哪些信誉好的足球投注网站
文档评论(0)