漆包线制造FMEA.docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
漆包线制造FMEA

XINLONG MAGNET WIRE CO.LTD 3 Process Potential Failure Mode Effects Analysis FMEA No. FM-002   (PFMEA) page  1 of 2 Project: enamelling process   Process responsibility: manuf.tech. dpt. Prepared by: Tu Jinqiang Team member: Tu Jinqiang, Deng Zhihua Xiao Yong, Qi Shun Date: Oct.17 2003 FMEA date(original) Oct.17 2003 (revise)     Process Function /Reqrmt. Potential Failur mode Potential Effects of Failure S C Potential cause/mechanism of failure O Current process control D R. P. N. recommended action Responsibility target completion date action result Action taken S O D R. P. N. Enamel the wire enamel on the bare wire,after curing,the magnet wire should meet all requirmt. Dimension:overall diameter out of standard Dimension:bare wire tolerance out of standard surface:have tiny bead Effect the wire assembly Influence the resistance Influence the appearance 4 6 4 Improper enamelling die; Improper felt regulating or the felt is used too long. the bare wire tolerance out of standard before enamelling;the wire thinned down during enamelling; Improper felt used or the felt is used too long;the enamelling die is dirty;the machine is not clean enough 6 5 7 inspect each spool inspect regularly and take 20% for spot inspection inspect each spool 2 4 2 48 120 56 Change enamelling die;regulate felt or replace the felt regularly; Inspect each spool of bare wire before enamelling;regualate the tension according to the work instuction; Regulate or replace the felt regularly; replace the enamelling die; clean the machine regularly Wire enamelling workshop Oct.31 2003 Wire enamelling workshop Oct.31 2003 Wire enamelling workshop Oct.31 2003 All the proposed action have been practised 4 6 4 2 3 4 2 3 2 16 54 32 Remarks: S is short for severity, C is classification, O is occurrence, D is detection, R.P.N. is risk priority number. Prepared by:Tu Jinqiang                 audited by: Shan Maogang   

文档评论(0)

xcs88858 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档