欧宝锅炉书.docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
欧宝锅炉书

Installation of MISSION? OC boiler General This chapter describes the work procedures which should be followed during installation of the MISSION? OC boiler. Corrosion preventive initiatives When the boiler leaves the factory corrosion preventive initiatives are taken to ensure the state of the boiler during transportation and intermediate storage. In the following section the corrosion preventive initiatives are briefly described. Cleaning of internal and external surfaces Internal and external surfaces are free from corrosion, grease, iron scale, and other impurities. This ensures that the surface treatment work is carried out without the risk of subsequent scaling. External surfaces External surfaces are painted with a thin layer of primer. Furnace and smoke uptake The furnace of the boiler plate is painted with a thin layer of primer. Furnace tubes, tubes in the convection part, and smoke outlets are painted on visible surfaces. Tubes inside cleaning doors are spray-painted. Visible surfaces in the smoke uptake are spray-painted. Water and steam side Internal surfaces on the water/steam side are treated, by adding an inhibitor to the water during pressure test. After pressure test of the boiler the water is drained and a powdered inhibitor is added. The powdered inhibitor provides sufficiently preservation during six months. At storage beyond this period contact Aalborg Industries or preserve the boiler again with VCI-609 powder inhibitor. Boiler bottom and top Raw/non-treated surfaces, plates, profiles, and tubes, that are visible from the outside, are spray-painted. Insulated boilers are painted with black painting. Closing of boilers Manholes and hand holes are closed with cover plates and gaskets. Flanged sockets are closed with plastic tube closing plugs. Smoke outlets and inlets, if provided, are closed with galvanised plates. If no burner is mounted, the fire hole in boiler front plate is closed with a galvanised plate. Bolts, blot supports, tap holes, hi

文档评论(0)

phltaotao + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档