实务21—25(Practice 21 - 25).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
实务21—25(Practice 21 - 25)

实务21—25(Practice 21 - 25) 2A320020 construction schedule control The preparation of 2A320021 master plan of construction progress First, the preparation of the schedule can be divided into the Gantt chart and network planning Two, pipeline construction can be divided into water, different rhythm rhythm flow, non rhythm flow three Three, control of the progress of learning mainly study from the following four aspects: The construction characteristics and 1. rhythm flow Gantt chart and the calculation of the construction period The construction characteristics and 2. non rhythm flow Gantt chart and the calculation of the construction period Application of 3. ordinary double code network plan Application of 4. time scale network plan The first part of rhythm flow construction points of knowledge summary Rhythm flow construction pipeline construction parameters of 1. construction process (n) 2. team number (n) 3. construction segments (m) 4. waterbeat (T): a work team continued in a construction period of time 5. flow step (K): two adjacent work team has started work (the most reasonable minimum time interval) The 6. period (T) The characteristics of all the waterbeat are equal to each other; All flow step are equal to each other, and is equal to the waterbeat; The work of each professional team can work continuously, the construction period of time without intermission; The professional team is equal to the number of construction process. Duration calculation formula of T= (mr+n-1) K R: the number of construction Typical case analysis A case Background: A project consists of A, B, C three projects, respectively, laying foundation, backfill excavation engineering, it is in the plane is divided into four construction section, the waterbeat in each construction section of the sub project was 3 days. Question: 1. the characteristics of rhythm flow construction. 2. with rhythm flow method of construction construction and pipeline construction drawing Gantt chart. Step 3. de

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档