- 1、本文档共9页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
TwoWay PostTensioned Design The Portland (TwoWay PostTensioned设计波特兰)
TIME SAVING DESIGN AIDS Page 1 of 9
Two-Way Post-Tensioned Design
The following example illustrates the design methods presented in ACI 318-05 and IBC 2003. Unless
otherwise noted, all referenced table, figure, and equation numbers are from these books. The example
presented here is for Two-Way Post-Tensioned Design.
Loads:
Framing Dead Load = selfweight
Superrimposed Dead Load = 25 psf partitions, M/E, misc.
Live Load = 40 psf residential
2 hour fire-rating
Materials:
Concrete: Normal weight 150 pcf
fc = 5,000 psi
fci = 3,000 psi
Rebar: fy = 60,000 psi
PT: Unbonded tendons
1/2”ϕ, 7-wire strands, A = 0.153 in2
f = 270 ksi
pu
Estimated prestress losses = 15 ksi (ACI 18.6)
fse = 0.7 (270 ksi) - 15 ksi = 174 ksi (ACI 18.5.1)
Peff = A*fse = (0.153)(174 ksi) = 26.6 kips/tendon
Determine Preliminary Slab Thickness
Start with L/h = 45
Longest span = 30 ft
h = (30 ft)(12)/45
= 8.0” preliminary slab thickness
Loading
DL = Selfweight = (8in)(150 pcf) = 100 psf
SIDL = 25 psf
LLo = 40 psf
IBC 1607.9.1 allows for LL reduction
Exterior bay: AT = (25 ft)(27 ft) = 675 ft2
K = 1
LL
LL = 0.83 LLo = 33 psf
Interior bay: AT = (25 ft)(30 ft) = 750 ft2
K = 1
LL
LL = 0.80 LLo = 32 psf
TIME SAVING DESIGN AIDS Page 2 of 9
Two-Way Post-Tensioned Design
DESIGN OF EAST-WEST INTERIO
您可能关注的文档
- Tsubaki Plastic Chain(椿本塑料链).pdf
- TT 505 NAGARAJAN THOPPEY MUTHURAMAN (TT 505纳THOPPEY MUTHURAMAN).pdf
- TT K04 install final FrankenTurbo(最终FrankenTurbo TT K04安装).pdf
- TTap Waterflow Detectors System Sensor(TTap水流探测器系统传感器).pdf
- TTEELLEECCOOMM BBIILLLLIINNGG (TTEELLEECCOOMM BBIILLLLIINNGG).pdf
- TTM Technologies Flex Webinar RTP Designers (TTM Flex技术研讨会RTP设计师).pdf
- TUB AND SHOWER VALVES Moen(浴缸和淋浴阀摩恩).pdf
- TUBA CITY ALTERNATIVE SCHOOL (大号城市选择学校).doc
- Tube drawing is very similar to bar drawing, (拔管非常类似于酒吧图,).pdf
- Tube Fitting Stainless SUS316 Series C D S I Pisco(管接头系列不锈钢SUS316 C D S我皮斯科).pdf
最近下载
- “双带头人”教师党支部书记工作室申报书.docx VIP
- DB37∕T 3452-2018 电梯使用安全风险分级管控和事故隐患排查治理体系建设实施指南.docx
- 2019年度广西优秀水利水电工程勘察设计奖候选项目表【模板】.pdf
- 11-034集控值班员(中级)第二版理论题库.docx VIP
- 传染病监测预警必修和选修答案-2024年全国疾控系统“大学习”活动.docx VIP
- 房地产营销策划 - 2020海南南丽湖度假项目推广方案.docx
- 食品经营许可证食品安全规章制度.docx
- 2016年中考英语一轮复习全册导学案.Doc
- SM-YK控制系统说明书.pdf
- 钱塘江河口水资源配置规划解决方案.doc
文档评论(0)