工务施工,人员乘车安全(Construction of public works, safety of personnel travelling).docVIP

工务施工,人员乘车安全(Construction of public works, safety of personnel travelling).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工务施工,人员乘车安全(Construction of public works, safety of personnel travelling)

工务施工,人员乘车安全(Construction of public works, safety of personnel travelling) A new double line, or reconstruction of existing line construction, need to be removed, change the existing line, bridge and tunnel building, communication, signal, power, traction power supply and water supply and drainage and other traffic equipment, the design unit is put forward to design the transition, the construction unit presided over the design construction and operation of all parties to participate in the review by. The construction unit construction organization design and safety design and protective measures, the project construction need to block or limit speed. Put forward the concrete operation plan for a month before, the local railway bureau or railway bureau approval, and before construction to handle the formalities to start the station points, the construction of the relevant works, such as electric vehicle operation departments should cooperate closely, ensure traffic safety. Two, where the existing station is to dial-up line opened operations, as the quantity and complexity of engineering, by the director or the person responsible for the command sent. Effect of complex technology, transportation, major dial-up opening operation, bureau leaders must personally command. Three, the new line design, to ensure the safety of existing lines, the added costs included in the budget. The design of class II section must be considered on transport construction safety measures. Four, the construction work section block or running speed, you must specify the person in charge of the construction work, written tests, process rules, clear responsibilities for technical training, according to the approved plan, to strictly implement the scheduling order, no more than to the point of time, according to the provisions of protection should be set before the start. When the operation is completed, the quality inspection to ensure the safety of traffic can be opened. If not it should notify

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档