索具使用(Rigging).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
索具使用(Rigging)

索具使用(Rigging) 14.8.1 storage Sling and rigging idle storage, the corresponding protection measures should be, not rust, corrosion or other harmful effects of high temperature and humidity. Protective measures should meet the following requirements: A. easy corrosion of mechanical parts, such as piston rod exposed parts should be yellow with glycerin coated with wrap rags and other items; B., part of the bearing, rotary rocking pin should be filled with grease; C. chain, wire rope slings should be cleaned and dried and then rub grease; D. fiber slings should be stored in ventilated and dry away from heat, and non corrosive chemicals places; E. not heavy pressure in the sling and rigging; F. shall not be under transverse load spreader, when directly placed will produce lateral load or deformation, should be placed in special hanger frame; G. should grab is in open state, claws or blade should be in contact with the ground pad of rubber plate or lumber. 14.8.2 maintenance 14.8.2.1 maintenance work by professional personnel to undertake. The technical performance of 14.8.2.2 maintenance and replacement parts shall keep the original parts. 14.8.2.3 sling is in working condition, should not for maintenance, repair or manual lubrication. 14.8.2.4 maintenance, the general should be removed from the sling hoisting machinery, because conditions are not removed, should take the following measures: A. should be a reliable protection measures or set up monitoring personnel; All the B. controller in the zero; C. cut off the main power supply, and hang (not power) obvious signs or dedicated guardian. 14.9 check 14.9.1 initial check The use of units for the new purchase, homemade or repair the sling and rigging before use, should check the full-time staff according to the standard of the corresponding provisions, determine whether they can put into use. 14.9.2 regular inspection The sling and rigging regularly by the daily use of personnel (including before use, the use of intermit

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档