塔吊抗倾覆验算(Anti overturning calculation of tower crane).docVIP

塔吊抗倾覆验算(Anti overturning calculation of tower crane).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
塔吊抗倾覆验算(Anti overturning calculation of tower crane)

塔吊抗倾覆验算(Anti overturning calculation of tower crane) A project overview Hawaii spring clean water project is located in Changsha Tian guihua. Two layer underground, 12 storey main building, frame shear wall structure, about 180 meters long, 65 meters wide, construction area of about 1040 square meters. Two, the selection of tower crane: The project area is large, wide operation, brings some difficulties to the location selection of tower crane. According to manufacturer specifications, types and characteristics of the project and the actual situation, the project adopts QTZ63 series D5610 type tower crane 3, vertical and horizontal transportation for materials and equipment to the construction site, the crane performance of this model is reliable and safe and convenient operation, the design department of the Ministry of construction Changsha construction machinery research and Design Institute Hunan South Building Machinery General factory. The three section layout. The basic can cover the whole surface of the construction, meet the height, amplitude. Three, the plane position of tower crane Crane position principle: the crane can rotate 3600; maximum coverage area; the construction site as far as possible without blind area; no influence on surrounding buildings; no touch, and safety between tower crane. 1, layout: To ensure the safety of production, reliable quality, convenient operation, vertical transportation of materials, semi-finished and finished products to cover the maximum working surface of the lifting range and rotation radius, and more than a little, to achieve the best efficiency and the best economic benefits, by comparing and investigating the decision. 2, the base position: 2# tower crane tower crane base is arranged in the center of D5610 (2 A) 3.6m (2 - south axis 21 axis South East 3.3m, 3.6m). Parallel to the axis of the base (2A). (see Figure plane position). The center coordinates: X = 88055.728, Y = 49579.670. The geological exhumation of t

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档