塔器吹扫、试压、充瓦斯方案(Scheme of blowing, testing and filling gas in tower).docVIP

塔器吹扫、试压、充瓦斯方案(Scheme of blowing, testing and filling gas in tower).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
塔器吹扫、试压、充瓦斯方案(Scheme of blowing, testing and filling gas in tower)

塔器吹扫、试压、充瓦斯方案(Scheme of blowing, testing and filling gas in tower) 2 million 400 thousand tons / year coking unit Tower purging and pressure test, gas charging scheme 1, tower through blowing and pressure test process Through blowing into a nitrogen purge replacement and steam purging and pressure testing. 2, through steam purging and pressure test note 1), tower steam pressure test for steam slowly to prevent accident of steam speed over the tray big bad; if there is leakage, pressure relief must be treatment, after treatment of the pressure test, until no leakage, and record; withdraw the pressure to continue to steam steam quantity, prevent the formation of a vacuum pumped into the air. 2), through steam purging and pressure test according to the operation of steam through purging and pressure test order, and with the operation and gas charging process. 3) tower, purging and pressure testing, to drain the steam in the tower, and maintain the micro positive pressure at the same time, filling gas, prevent the tower due to the negative pressure pumping bad equipment, gas charging process see gas charging a fine. 4), tower sweeping first to catch the air, then to preheat, preheating tower body after pressure test. 3, tower through purging and pressure test process 1), the absorption tower C301 through purging and pressure test process The absorption tower C301 end to the bottom of the tower top, steam dewatering and emptying. 2) and reabsorber C303 through purging and pressure test process Reabsorber C303 to the bottom of the tower bottom steam, dewatering and emptying tower. 3), the desorption tower through purging and pressure test process C302 to the bottom, steam desorption tower desorption tower C302 (dehydration tower and tower bottom emptying), compressor EA301, compressor outlet air cooler outlet liquid tank V301 (bottom dehydration, tank top emptying). 4), stable tower through purging and pressure test process Stability of tower C304 end to steam, stability

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档