事中质量控制(Quality control in process).doc

事中质量控制(Quality control in process).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
事中质量控制(Quality control in process)

事中质量控制(Quality control in process) Two. Quality control. 1, the handover process: transfer of work, confirm the completion of the process of the supervision, witness, deal with problem, for the next procedure construction preparation. There are two types of construction site: The different construction units in the handover process, supervision and supervision personnel among witness. (hardcover and structure construction team transfer) to reflect the specific:, walls, windows and doors, roof size checking, waterproof room water test transfer pipeline point transfer of geothermal pipe, water test, pressure test, electrical recording, confirmation procedure qualification, procedures for the transfer of the remaining issues, the floors and rooms, the relevant professional is not complete, quality defects requiring rectification, supervision personnel according to the agreed two acceptance. The qualified procedure, fine decoration according to the order of looking for, find the side is to ensure the fine decoration of precise size, the structure error elimination in the error range of hardcover allowed, the ash ash fill, tick the chisel. To avoid the deviation of the wall, the small end of the shed. Key: Waterproof room a water leakage; the window sash window installation center, main frame verticality; ground decoration size can meet the requirements (geothermal, cold water pipe across the distance away from the wall thickness) of supply and return water pipe radiator, toilet, bathtub, shower water, sewer pipe from a height from the wall the wall tube size, cabinets, cabinet fixed point selection. (two times of masonry wall shall not be used as a fixed point). The supervision personnel of the handover process to 100 witness acceptance. (Contractor) transfer, the structure of the construction unit to receive fine decoration. The general contractor of a hardcover activity, the supervision personnel of each item, batch inspection inspection table for signing two differen

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档