项目报规报建规程(Project report gauge construction procedures).docVIP

项目报规报建规程(Project report gauge construction procedures).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
项目报规报建规程(Project report gauge construction procedures)

项目报规报建规程(Project report gauge construction procedures) First, land clearance: 1.: land transfer contract to obtain land use rights and land transfer contract signed by the transfer of the way. The 2. land survey map. 3. construction land ratification. 4. of the land tax, tax clearance certificates (Finance Bureau and Local Taxation Bureau). 5. the application for land registration, land use warrants issued audit. Two, planning procedures: 1. of the total planning, planning and design to declare the planning committee after the planning permit for construction land planning permit approval according to plan. The time required for 2-3 weeks. 2. construction project planning permit, according to the master plan, the preliminary design of the project construction monomer, monomer project planning permission declaration. The time required for 2-3 weeks. 3. pay fees for technical services, planning and supporting fees, management of urban construction archives transfer contract. Three, project development and Reform Commission project: The application report of 1. project (Engineering Consulting Institute). 2. project planning approval, general layout. 3. environmental impact assessment (EPA). 4. seismic fortification (Seismological Bureau). The views of the 5. Committee and other departments of radio. 6. after completing the above material submitted to the NDRC for approval after project approval. Four, engineering construction procedures: 1. site three Ping, to level the ground and water, electricity, roads with construction conditions. The 2. survey and design engineering. According to the single project planning survey and specific requirements, a detailed survey report after the investigation unit, design unit design drawings. The time required for 6-7 weeks. 3. design drawings review: construction drawing review (bureau of construction drawing audit center), fire protection design review (Fire Department), lightning protection design review (CMA), civil air defense

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档