石化建设三级质量控制点6(工艺管道安装)(Petrochemical construction three level quality control point 6 (process piping installation)).docVIP

石化建设三级质量控制点6(工艺管道安装)(Petrochemical construction three level quality control point 6 (process piping installation)).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
石化建设三级质量控制点6(工艺管道安装)(Petrochemical construction three level quality control point 6 (process piping installation))

石化建设三级质量控制点6(工艺管道安装)(Petrochemical construction three level quality control point 6 (process piping installation)) Petrochemical construction three level quality control point 6 (process piping installation).Txt what is called myth? Listen to men express love to you. What is the legend? Listen to the mans promise to you. What is a dream? See how you react when you hear the first two. This article is contributed by zhuweiwei_1113 DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. A, B, C three quality control points (9 pieces) Control points for process piping installation (9-6) Install numberstage preparation stage 9 control design disclosure of joint examination of construction drawing, material inspection and acceptance of construction plan review registration qualified welder welder qualification check valve fittings and pipeline processing and pipeline prefabrication and installation for pipe frame quality supervision and control points of the AR AR AR type BR BR BR AR C C W W W H H H W S S control content Special requirements in the design, should pay attention to the problems in the construction and material selection of construction problems, the construction is not clear and the inconvenient places mentioned are discussed with the certificate, the sampling results are consistent with the construction schedule, construction equipment design requirements, construction technology, quality assurance measures and safety measures qualified welder certificate number, name, project review record checks, welding steel pipe fittings size valve seal strength and hardness test, the valve seat sealing test and leakage test of welding and welding inspection of the project, most small radius pipe wall thickness, pipe ovality, heat pipe compensation prestress check free status deviation, check the fixed orientation with the spring support pipe bracket Stage 1011121

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档