- 1、本文档共24页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
机房验收明细清单
FORM 820
GENERIC TEST ACCEPTANCE CHECKLIST
Site: BVAPP: Engineer: Job Vendor: Date of Installation completion: Date of Vendor Departure: Tested by: Date: ITEM YES NO Equipment Verification Frames located per floor plan Installed per drawings Equipment is what was ordered Equipment options are correct Spare equipment provided per ordering spec (if applicable) Power feed to equipment checked Workmanship Frame alignment and equipment mounting Relay rack numbering Wiring and cabling Equipment numbering and lettering Cable openings sealed Cable racks and other ironwork Power and fusing (spare fuses available also) Performance Tests Tests per recommended equipment manual Tests per Test Acceptance package sent out with job (contact the Engineer if no such package sent) Documentation As-built drawings sent back to engineering Replacement drawings Initial battery charge reports (if applicable) Equipment manuals received Original test results retained Alarms Affected alarms tested prior to work start Local and audible alarms (as applicable) tested prior to work start Remote alarms installed and tested with NROC Alarm Center (800-713-3666) Name of NROC Center Contact with whom alarms were tested: Other Comments (all No answers must be commented on)
FORM 821A
POWER ROOM LIGHTING TEST ACCEPTANCE CHECKLIST
Site: BVAPP: Engineer: Job Vendor: Date of Installation completion: Date of Vendor Departure: Tested by: Date: ITEM YES NO 1. Lighting provided in the power areas is adequate, and located in accordance with the SITE: record lighting plan drawing 2. As a minimum, emergency and task/stumble lighting is available in stairwells, over the power board, over the engine control panel and AC transfer switch, over the AC switchgear, and in the engine room 3. Emergency and task/stumble lighting works 4. Feeding fuse/breaker positions and emergency and task/stumble lighting f
您可能关注的文档
最近下载
- 省级优秀课件人教版(2019)高中英语必修第一册 Unit 5 Languages Around the World Reading and Thinking.pptx VIP
- Unit1 School life 单元主题阅读、完形及满分范文15篇-2024-2025学年六年级英语上册重难点讲练全攻略(牛津上海版2024).docx
- 19BJ5-1 屋面详图图集.pdf
- 变电运行标准化作业指导书.pdf VIP
- 《流行声乐演唱》课件——1课程介绍、理论知识、演唱特点以及与传统唱法的区别.pptx VIP
- 气候归因周天军.ppt
- 小学科学新教科版一年级上册第二单元第2课《发现生长》教案2(2024秋).doc
- 2022新人教版数学五年级上册第一单元《小数乘法》教学设计.docx
- 标准化病人SP病史采集培训(问诊)教学讲义课件.pptx VIP
- 少儿美术-玉兰花.pptx
文档评论(0)