启动炉化水运行规程(Start furnace water operation rules).docVIP

启动炉化水运行规程(Start furnace water operation rules).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
启动炉化水运行规程(Start furnace water operation rules)

启动炉化水运行规程(Start furnace water operation rules) Ten. Operation regulation for starting furnace water 1 operation regulation of demineralized water system 1.1 overview Demineralized water treatment system mainly reduces the hardness of water, and suspended suspended mechanical impurities, to meet the requirements of starting furnace water replenishment. The system consists of a complete set of softening equipment, a complete set of regeneration equipment, salt pump, softening pump, softening water tank, resin loading and unloading trolley, etc.. System process flow: water supply, water supply, sodium ion exchanger, softening water tank, softening water pump, starting boiler deaerator 1.2 equipment specifications for demineralized water treatment systems Serial number device Name, model and specification unit quantity remark 1 sodium ion exchanger with 1800mm Q=80 t/h H001 * 7 1200mm 3 Taiwan ranked as a pipe type water inlet, outlet for porous plate water cap type, counter current regeneration. 2 softening tank V=200m3 phi 6480mm, 1 lined with epoxy resin 3 HZ50-200 h= 0.500.45m Taiwan Q=3060m3/h softening water pump motor 3 Y160M22 N = 15kw The 4 solution DN900 2 5 with the DN600 1 6 salt liquid pump, HZ32-125, Q=7.2m3/h, h=, 0.16m, 2 motors, Y80Z - 2, N = 1.1kw 1.3 operation operation and notice 1.3.1 check before startup A) all valves in the standby sodium bed are closed and the gauges have conditions of use. B) drainage channels clear. C) motors, pumps, water tanks, pipes, valves are in standby. D) the pressure of water supply pipe is 0.2 ~ 0.6MPa. Starting, running and stopping of 1.3.2 sodium bed 1.3.2.1: open the flushing sodium bed backwash water discharge valve and the inlet valve, flushing water pipe to the drainage water is transparent and no mechanical impurities, close the sodium bed inlet valve, backwash water discharge valve (only use the equipment to start again after the full stop). 1.3.2.2 wash: open the sodium bed, air door, water inlet, wait until

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档