售房答疑会(House press conference).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
售房答疑会(House press conference)

售房答疑会(House press conference) House press conference First, the housing itself 1, the housing heating from heating, a heating season is expected to spend much? District heating, land heating, radiation, energy use, municipal pipelines of natural gas, because it is self heating, according to each household regulation temperature, heating costs vary from person to person. 2, hydropower gas is municipal access, the purchase contract clearly stated whether the civil price, electricity is not temporary electricity? Water, electricity, gas are municipal access, in the purchase contract clearly stated, is the civil price. 3, others (completed heating and construction) how much is the floor height, the layers are the same? The five storey standard layer is 3 meters, the local height is 3.3 meters; the six storey standard layer is 2.8 meters, the local height is 3.3-3.35 meters, and the ground floor is 2.9 meters. 4, terrace and balcony how to purchase, how to calculate the area? The balcony is not included in the purchase area, balcony area is calculated according to the half, Piaochuang area of gifts, not included in the purchase area. No alterations to the balcony. Two, residential environment 1 when will the whole B district be completed, when will the near A zone be built and when will it be completed?. B District buy contract blank submitted time is July 2013, refined decoration submitted by the end; A zone start time plan is by the end of 2012, completed by the end of 2013 for the record. 2, residential construction before the landfill site, the specific location of the landfill in which area of the district? District landfill has all hollowed out, and backfill earthwork construction, the normal life will not have any impact. Three, property 1, what time the surrounding facilities built, such as clubs, deshang. The existing sales office is the next 2300 square metres of clubs, including swimming pool, gym, etc., built time, fees have not yet been determined. District

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档