- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
预算公式(Budget formula)
预算公式(Budget formula) First, the basic cushion material conversion method: 1, lime, sand, gravel, bricks, etc. single material quota amount of press type selection: Quota dosage: unit of measurement * compacting factor * (1+ loss rate) Compacting factor = Virtual thickness / compacted thickness 2, a variety of materials mixed cushion is mixed with the amount of semi-finished products into the quota, and its compaction coefficient in the proportion of fixed appendix has been considered. 3, gravel or rubble grouting mortar or sand cushion, the amount calculated by the formula: Mortar (sand) = * filling density * (1+ loss rate) * unit of measurement. Examples: the meter 2-116 1:1 case (section of sand gravel cushion mix ratio by volume calculation): (1) the porosity of the stone is * 100%=44.4%, and the compactness of the gap is 90%. (2) amount of crushed stone 40MM: 0.5 (measurement volume) * 1.04 (compacting factor) * 1.5 (bulk density) * 1.02 (loss) =0.8T (3) sand dosage: 0.5 (fixed metering volume) * 1.04 (compactness) * 1.46 (bulk density) x 1.05 (dense coefficient) / 1.18 (here should be considered in the dry sand moisture expansion rate of 18% =0.676T). Use sand filling gap: 0.5-0.5 * 0.56 (* 0.9 stones of dense volume) (1.46 x 1.04 x 1.18 x 1.05 / =0.28T) The total amount of sand: (0.676+0.28) * 1.02 (loss) =0.98T. Two, brick material conversion method: The theoretical formula for the amount of brick and mortar used in brick walls of different thickness per cubic meter is as follows: A= * K A: Brick theory consumption K: brick number of wall thickness * 2 (brick wall thickness refers to 0.5, 1, 1.5, 2, etc.) Net amount of mortar =1- brick wall * per brick volume Examples: a 3-29 meter brick wall section as an example Standard brick dosage: =529.10 block /M3 The projecting wall tile line, the buckle beam head, the pad block, the prefabricated plate first class increase 0.268%, namely 529.10 * (1+0.268%) =530.51 block /M3, another count loss: 530.51 * (1+1%) =536
您可能关注的文档
- 谚语及诗句的中英对比(A contrastive study of proverbs and verse in Chinese and English).doc
- 谚语翻译(Proverb translation).doc
- 质粒 dna(质粒 dna).doc
- 贪婪算法--- 拓扑排序(The greedy algorithm, topological sorting).doc
- 贴膜问答知识(Film quiz knowledge).doc
- 贸易实务计算题(Trade practice calculation).doc
- 质量改进常用方法之排列图(The quality improvement methods of arrangement).doc
- 资产评估三(Asset evaluation three).doc
- 资料员专业管理实务(10-11节)(Professional management practices for Librarians (section 10-11)).doc
- 贫困地区农村幼儿教师专业成长的现状、问题及对策(The status quo, problems and Countermeasures of preschool teachers' professional growth in rural areas of poor areas).doc
有哪些信誉好的足球投注网站
文档评论(0)