- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
项目设计委托书(Project design authorization)
项目设计委托书(Project design authorization) XXXXXX project commissioned design task book Party A: (hereinafter referred to as: Party A) Party B: (hereinafter referred to as: Party B) After negotiation, the agreement of Party A entrusts Party B for the two stage project of Arcadia The design of construction drawings of the single building project shall be conducted by Party B according to the requirements of Party A, and the specific design points shall be as follows: I. architectural major: The absolute elevation of 1 and + 0 is determined by the vertical elevation map of the general plan. 2, into the household unit door of hall and outdoor road elevation for the proposal to change the phase II + 80 mm; flat apron and bottom elevation and interior staircase hall; elevation of - 15 mm 3 basement lighting: semi basement with high window lighting. 4, the number of layers, units, Huxing combination to Party A Huxing and master plan shall prevail, the relevant requirements for Apartment details: indoor doors are only reserved for openings, do not do doorframe, door to door, unified installation of steel safety door, safety door size is 1000 * 2100; unit door for visual intercom, electronic anti-theft door, reserved power supply. 5, elevator: elevator for 800 kilograms of MITSUBISHI elevator; according to the head of the companys strategic partner product technical standards to do the reserved design; elevator does not arrive underground garage. 6, kitchen and toilet design details required by Party A validation sample; 7, air conditioning board and related: the size and location of the air conditioning board should meet the requirements of the installation of air conditioning, air conditioning, air conditioning and air conditioning socket hole plate position, the height should be reasonable, living room air conditioning hole height from the ground 0.1M, the rest of the room 2.1m (low hole); the outdoor air conditioning board Aluminum Alloy louver fence. 8, cloakroom requiremen
您可能关注的文档
- 谈音质标准与音质评价方法(Talking about sound quality standard and sound quality evaluation method).doc
- 诺贝尔物理学奖(Nobel prize in Physics).doc
- 调擦问卷(Adjustable wipe questionnaire).doc
- 谜语附答案(Riddle with answer).doc
- 责任心与执行力(Sense of responsibility and executive ability).doc
- 质检部管理制度(Quality control department management system).doc
- 谭盾音乐的神秘主义倾向(The mystical tendency of Tan Dun's music).doc
- 质监局企业服务年活动方案(Activity plan of enterprise service year of Quality Supervision Bureau).doc
- 贞观名臣张公谨(Zhenguan Ming Chen Zhang Gongjin).doc
- 谁有syb创业计划书的范文或成品知道(Who has the sample or finished product of the SYB business plan).doc
最近下载
- T-CECS 1049-2022 隧道衬砌拱顶带模注浆材料应用技术规程.docx VIP
- 安全生产法知识培训课件.pptx VIP
- 完整版中小学《文明礼仪主题教育》主题班会课件PPT.pptx VIP
- 广日G·Fre 载货电梯维修手册.pdf
- Brivo CT技术参考手册.pdf VIP
- 心血管药物临床应用指导原则(征求意见稿).pdf VIP
- 中国糖尿病诊疗指南(2025版) .pdf VIP
- 住院精神障碍患者康复指南 __DB14_T 2263-2021.docx VIP
- 2025年辽宁全国导游人员资格考试(全国导游基础知识、地方导游基础知识)历年参考题库含答案详解.docx VIP
- 院长纠错申请书(模板).docx VIP
有哪些信誉好的足球投注网站
文档评论(0)