- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
轻钢龙骨石膏板吊顶(Light steel keel, gypsum board, ceiling)
轻钢龙骨石膏板吊顶(Light steel keel, gypsum board, ceiling) Construction guide - light steel keel, gypsum board ceiling construction program and process (1) requirements for material purchase parts; 1. light steel skeleton, U type skeleton and T type skeleton two, and according to load points, people and not up to people. 2., light steel skeleton main parts for large, medium, small keel; accessories have hanging, connecting parts, hanging plug-in. 3. spare parts: suspender, flower blue screw, nail bolt, tapping screw 4. according to the design instructions, we can choose all kinds of face panels. Aluminum pressure bar or plastic pressure bar, its material varieties. Specifications. Quality should comply with the design requirements. 5.: according to the material properties of binder should be selected before use as bond test. (two) main implements; The main equipments include: chainsaw, tooth free saw, nail gun, hand, hand plane, pliers, screwdriver, wrench, feet, ruler, steel level etc.. (three) working conditions; 1. construction, should be in the cast-in-place concrete floor slab or precast concrete floor, according to exit requirements according to the embedded, Phi 6~ Phi 10 reinforced concrete boom, exit request according to location of the pre buried steel keel hanger, general spacing why 900~1200mm. 2. when the ceiling rooms for brick masonry wall column, in elevation along the ceiling around the wall and column, masonry pre buried anticorrosive wood block, along the wall column spacing 900~1200mm, each side should be no more than two pieces of brick buried shot. 3. after the installation of pipeline ventilation and ceiling, to determine a good light, and all kinds of open vent holes. 4. all kinds of materials are fully equipped. 5. ceiling cover panels should be finished before the wall, ground wet operation project. 6., build a good platform for roof construction platform. 7. ceiling light steel skeleton in the large area before construction, should do model, the r
您可能关注的文档
- 绿谷光电推动led洗墙灯,投光灯发展的战略选择(附图)(Green Valley drive LED wash wall lamp photoelectric, light development strategy (Figure)).doc
- 绿茶是未经发酵的(Green tea is not fermented).doc
- 绿茶饮用方法(Green tea drinking method).doc
- 综合仿生设计在现代工业设计中的应用)(Application of integrated bionic design in modern industrial design).doc
- 缘分的英文表达(The English expression of fate).doc
- 缩小数据文件尺寸报ora-03297的处理办法(How to reduce the size of data files and report ora-03297).doc
- 缩短win7程序响应时间(Shorten the win7 program response time).doc
- 缩短期刊论文发表时滞的意义与途径(Significance and ways to shorten the time lag of periodical publication).doc
- 绿色出行,让生活更美!(Green travel, make life more beautiful!).doc
- 缩短开机等待(Shorten boot waiting).doc
有哪些信誉好的足球投注网站
文档评论(0)