论工程变更与造价控制(Engineering change and cost control).docVIP

论工程变更与造价控制(Engineering change and cost control).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
论工程变更与造价控制(Engineering change and cost control)

论工程变更与造价控制(Engineering change and cost control) This paper analyzes the influencing factors of engineering change, introduces the management and treatment principles of engineering change, and expounds the cost control of engineering change for reference. Keywords engineering change; influence factor; management; treatment principle; cost control; Due to limitations of the early work of the project, some of the actual situation and the original design documents appear inconsistent and found the original design errors, omissions or for other objective factors and change the original design scheme, structure, quantity or adjustment of the original contract work content often in practice, which leads to the engineering change. Any of the parties involved in the construction of the project, including the owner, the engineer, the contractor and the design party, may, as long as the foregoing has occurred in the implementation of the works, change the project accordingly. Any change in the project will affect the normal construction operation of the project, and it will affect the time limit, cost and cost, increase the investment of the project, and then affect the income of the projects investors. Therefore, the engineering change will directly increase the capital input of the project, which will make the investment out of control and affect the investment efficiency of the construction project. Frequent engineering changes will increase and disrupt the normal working steps and contents of the owner and the contractor, organize and coordinate the workload will increase the supervision engineer, are unfavorable to the contract management and quality control, increase the difficulty and complexity of project management, and indirectly led to increase the project cost. In recent years, with the development of Chinas economic construction and the expansion of opening to the outside world, a large number of industrial and civil buildings and infrastructure construction proj

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档