301 Madrid, SPAIN Coordination of Protection (301年马德里,西班牙的协调保护).pdfVIP

301 Madrid, SPAIN Coordination of Protection (301年马德里,西班牙的协调保护).pdf

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
301 Madrid, SPAIN Coordination of Protection (301年马德里,西班牙的协调保护)

Study Committee B5 Colloquium 2007 October 15-20 301 Madrid, SPAIN Coordination of Protection Relays Hideyuki Kameda (CRIPI, JP), Seung-Jae Lee (Myongji Univ., KR), Eva Werdin (Svenska Kraftnat, SE), Zainoren B. Xhukri (Tenaga, MY), Henri Grasset (Areva, FR), Takahiro Kase (Toshiba Int., UK), Chikashi Komatsu (Hitachi, Ltd., JP) Abstract Protection, seen as the recovery of the power system to a stable state, depends not only on the reliability and technical excellence of its components but also on the adequacy of the functions to the application for which they were designed. Protective relaying, as many other systems, is not made by ideal entities, but by dispersed, discrete and non error-free ones. These devices, IED, or more generally functions need to be linked with each other in an organized manner in order to allow the Protection System acting as a whole and in a selective way: Coordination is the technique, art or process that makes this possible. This paper constitutes the introduction to the WG B5.19 Report which covers protection system coordination issues. The Report presents the results of a worldwide questionnaire regarding protection system functions breakdown by power system components, voltage level, Main and Backup, including Special Protection Schemes applications. Examples of required coordination studies are also pointed out in this paper, whilst the Report will deal with a more detailed sequence of the coordination between protective relaying devices and functions, illustrating with concrete situations.

您可能关注的文档

文档评论(0)

jiupshaieuk12 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档