MULTIDIAMETER, BIDIRECTIONAL PIGGING (MULTIDIAMETER,双向清管)
MULTI-DIAMETER, BI-DIRECTIONAL PIGGING FOR PIPELINE PRE-COMMISSIONING
By: Magne Andreas Vik, StatoilHydro; Alf Åge Kristiansen, StatoilHydro
Simon Sykes, FTL Seals Technology; Steve Hutcheson, Pipeline Pigging Technology
and Aidan O’Donoghue, Pipeline Research Limited.
This paper examines the issues associated with multi-diameter, bi-directional pigging specifically for
pipeline pre-commissioning. The technique can be used to flood and subsequently dewater a
pipeline without the need for temporary subsea traps. An example is the Alve Pipeline in Norway.
This 16 km flow-line from the Norne Platform to the Alve Manifold includes 10” and 12” pipe sections.
The line was flooded from Norne using the pig with oxygen scavenged seawater and then dewatered
using Nitrogen and produced gas from the well. The pigs needed to have a high sealing efficiency
since very low velocities were used to flood the line and in order to avoid hydrates on dewatering.
Multi-diameter wheel pigs were employed with non-buckling disc type seals. This paper describes
the design of the pigs and the seals to achieve the required functionality. The test facility and testing
performed to verify the pig performance is also illustrated. Finally, an overview of the offshore pigging
operation is provided.
Introduction
In order to flood and subsequently dewater the Alve flow line, a number of high seal, multi-diameter
and bi-directional pigs were required. The pipeline contains several internal diameters from 10” to 12”.
Since no pigging from the Alve manifold was possible (no launcher), all operations needed to be
performed from Norne FPSO.
Four pigs spaced with MEG were launched from Norne with oxygen scavenged water, propelled
through the pipel
您可能关注的文档
- Model identification and parameter estimation (模式识别和参数估计).pdf
- Model Evaluation 2009 Honda DN01 (2009年本田DN01模型评价).pdf
- Model No. (Crosslenticular screen) Bright mode (模型没有。).pdf
- Modelbased normalization for iterative 3D PET (基于模型的规范化为迭代3 d宠物).pdf
- Modelica Tutorial for Beginners Caltech (Modelica教程适合初学者加州理工学院).pdf
- Modeling and Analysis of SVC, TCSC, TCPAR in (建模和分析SVC、TCSC TCPAR).pdf
- Modeling and Analysis of a Surface Milling (铣削表面的建模和分析).pdf
- Modeling and Analysis of an Atmospheric Driven (大气驱动的建模和分析).pdf
- Modeling and Analysis of the Synchronous (同步的建模和分析).pdf
- MODELING AND CHARACTERIZATION OF FRE (建模和描述的).pdf
文档评论(0)