市政工程质量通病及防治(Common problems and prevention of municipal engineering quality).docVIP

市政工程质量通病及防治(Common problems and prevention of municipal engineering quality).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
市政工程质量通病及防治(Common problems and prevention of municipal engineering quality) Common problems and prevention of municipal engineering quality drainage section Municipal road drainage system is one of the important facilities for the normal use of municipal facilities. It is very important to ensure its construction quality. The common quality defects of municipal drainage pipe project construction quality are divided into four aspects, the causes are analyzed, and the prevention measures are put forward. I. deviation of pipe position or water accumulation (1) causes: Measurement errors, construction aliasing and unexpected avoidance of the original structure, in the plane on the location of displacement, elevation on the surface of the water, or even slope phenomenon. (two) preventive measures: 1., measures to prevent the measurement and construction are as follows: (1) before construction, according to the construction survey specifications and procedures for handover pile re test and protection. (2) the construction lofting according to hydrogeological conditions, according to the buried depth and the design requirements and the relevant provisions setting out, and must meet the requirements of the test retest error to the delivery of construction; (3) construction should be carried out in strict accordance with the kind of pile base to make peace trench axis and longitudinal slope measurement acceptance. 2. during construction, when the building must be avoided, the connecting well shall be added at the proper place, and the connection angle shall be greater than 135 degrees. Two, pipe seepage, closed water test failed (1) causes Water leakage can be caused by uneven foundation sinking, poor quality of pipe and its interface construction, incomplete plugging of end of closed section and poor quality of well construction. (two) prevention and control measures 1., the poor foundation of the pipeline will lead to uneven settlement of the pipeline and the foundation

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档