- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
石油工程专业英语教案
Company Logo English for Petroleum Engineering 姓 名:曹 成 班 级:2010级十班 Unit 6 Well Completion 1 2 INTRODUCTION Part One Text Unit 6 Well Completion After great efforts have been made in the determination of physical properties of a reservoir and drilling to the desired depth, a well is not ready for production, which means oil is not to flow automatically out of the hole that has been drilled. Something lying between the finished hole and actual production has to be done. This something is called well completion. 在经过巨大努力完成了油藏相关物理参数的测定,并钻至设计井深之后,油井仍然还不能用于生产,因为原油不会自动地从所钻井筒的外面流入井筒。在钻井与油气井生产之间还有一些事情需要完成,这些事情就叫做完井。 INTRODUCTION Unit 6 Well Completion Since well completion is as important as drilling ,one needs to know the specific steps involved in the completion ,which has received elaborate description in the coming passage. It is advisable for you, as you do with other articles, to have a hawk’s eye for such key terms as downhole string, secondary cementing, open-hole completion, perforated completion, wire-wrapped screen completion, wellhead, Christmas tree, etc. 由于完井与钻井一样重要,人们需要了解完井过程的具体步骤,这也是下文所重点描述的内容。像看其它文章一样,着重留意关键词语是非常有用的,像井下管串、二次固井、裸眼完井、射孔完井、绕丝筛管完井、井口、采油树等。 INTRODUCTION Well Completion Casing Series Open-hole Series Perforated Completion Casing?gravel pack?completion Open-hole completion Open-hole gravel pack completions Slotted liner completion wire-wrapped screen completion Unit 6 Well Completion 1 2 INTRODUCTION Part One Text Unit 6 Well Completion After a well has been drilled to the projected depth and the productive formations have been evaluated as economical to produce, the work of setting the casing, preparing the well for production, and bringing in the oil or gas begins. 油井钻至设计井深,并且产层评估显示该油井具有经济生产价值之后,下套管、准备油井生产、采油采气等工作就开始了。 Part One Text Unit 6 Well Completion Completion equipment and the methods employed are quite varied, and the decisions for an
您可能关注的文档
最近下载
- 《天上有颗南仁东星》第二课时 课件 八年级语文上册 统编版.pptx VIP
- 新人教版高中物理必修三第十一章《电路及其应用》测试题(含答案解析).docx VIP
- 14、圆明园的毁灭(课件)第二课时2023-2024学年五年级上册语文(统编版) (1).pptx VIP
- 北师大版四年级数学上册第三单元《乘法》(大单元教学设计).docx VIP
- 同上一堂党课初中篇 中流砥柱观后感五.doc VIP
- 必威体育精装版2016-2017学年秋季学期人美版小学六年级上册美术教案全册.doc VIP
- 《互联网》精品课件.pptx VIP
- 浙江维思通新材料有限公司年产 20000 吨锂电池新型材料项目环评报告.docx VIP
- BIM基础培训教材课件.pptx VIP
- 管理学:激励PPT教学课件.pptx
文档评论(0)