建筑物外墙为什么容易渗漏水用什么方法治理(Why does building exterior wall leak water easily, with what method government).docVIP
- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑物外墙为什么容易渗漏水用什么方法治理(Why does building exterior wall leak water easily, with what method government)
建筑物外墙为什么容易渗漏水用什么方法治理(Why does building exterior wall leak water easily, with what method government) Why does building exterior wall leak water easily, with what method to manage? First, the wall masonry quality is not good In the quality defects of brick masonry, the reasons for affecting exterior wall leakage are: 1, brick level, gray mortar mortar fullness less than 80%, vertical mortar no mortar (empty gap or blind joint), for rainwater leakage reserved internal channel; 2, the frame structure filling wall close to the bottom of beam or plate bottom, without stopping, the masonry skew beam and plate top to bottom, with masonry mortar for compression deformation, cause the wall to sink, a gap formed inclined brick bodies and beams, plates, wall plaster or scraping brown. The cracks in the gap formed at; 3. The tension bars between the frame column and the filling wall do not meet the modulus of the brick. When the building is bent, the bending steel bar is pressed into the brick layer to form a local position, and a larger gap is formed between the masonry and the column, and the crack is easy to occur when the plastering is made. Preventive measures: 1, improve the mortar workability, the promotion of 31 building, is strictly prohibited to use dry brick walls, to ensure the full degree of mortar and improve the bond strength; 2, fill the wall to close to the beam, plate bottom, should be 15 days later, and then fill it up, compaction, and cement mortar will be inclined to brick seam filling, dense; 3, according to brick modulus, on the frame column planting steel. Two, improper handling of exterior walls 1. When the feeding hole is blocked, the blind hole is not connected with the original hole; 2, after the completion of the project, the residents in the wall to take air conditioning pipe holes, solar water heaters, pipe holes, exhaust fan holes, resulting in cracks in the wall and outside powder. Due to the limitations of the conditions, the residents and the
您可能关注的文档
- 学生用卡西欧计算机用法(Students use CASIO computer).doc
- 学英语20条钻石法则(Learn English 20 diamond rules).doc
- 学生会个人工作计划范文_个人工作计划范文(The student individual work plan _ individual work plan.).doc
- 学期授课计划(Term plan).doc
- 学车知识(To learn the knowledge).doc
- 学英语20钻石法则(Learn English 20 diamond rules).doc
- 孩子学围棋的十个阶段(Children learn the ten stages of weiqi).doc
- 孵化基地1(Incubation base 1).doc
- 完全脱离鼠标(Completely detached from the mouse).doc
- 宅男约会注意(Otaku dating attention).doc
- 建筑物沉降观测,前视读数,后视读数,前视标高,什么意思及市政测量工作心得!(What do you mean by building subsidence observation, front view reading, back reading, front view elevation And municipal measurement work experience!).doc
- 建筑物变形观测(Building deformation observation).doc
- 建筑电气外文翻译(Building electrical foreign language translation).doc
- 建筑电气英文翻译998(Building electrical English 998).doc
- 建筑电气论坛题目(Building electrical forum topics).doc
- 建筑电气方面的知识(Knowledge of building electrical).doc
- 建筑的基本术语(Basic terms of Architecture).doc
- 建筑空间的形态分析方式(The form analysis of architectural space).doc
- 建筑空调系统节能技术措施探讨(Discussion on energy saving technical measures of building air conditioning system).doc
- 建筑结构的基本概念(Basic concepts of building structures).doc
文档评论(0)