建筑电气方面的知识(Knowledge of building electrical).docVIP

建筑电气方面的知识(Knowledge of building electrical).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑电气方面的知识(Knowledge of building electrical)

建筑电气方面的知识(Knowledge of building electrical) In the system diagram is a combination of various symbols, I hope the following can help you: I. The indication of the wire through the tube: PVC tube: PC20, Welded pipe: SC20, Buckling type thin-wall galvanized wire pipe: KBG20, Tight galvanized thin wall wire tube: JDG20, Two, electrical design and construction drawings are commonly used line laying method: SR: laying along the steel groove BE: laying along the roof truss or roof truss CLE: laying along columns or columns WE: laying along the wall CE: laying along the ceiling or ceiling ACE: laying in the access ceiling BC: buried in the beam CLC: buried in the column WC: buried in the wall CC: concealed in the ceiling ACC: concealed in the ceiling that is not accessible FC: buried in the ground SCE: the ceiling should be laid with metal pipe First, the conductor through the tube that SC- welded steel pipe MT- wire tube PC-PVC plastic hard tube FPC- flame retardant plastic hard tube CT- Bridge MR- metal wire groove M- cable CP- metal hose PR- plastic wire groove RC- galvanized steel pipe Two. Indication of wire laying method DB- buried directly TC- cable trench BC- concealed in the beam CLC- concealed in columns WC- concealed in the wall CE- is laid along the ceiling CC- concealed in the ceiling SCE- ceiling laying F- floor and floor SR- along the tightrope BE- along the roof beam WE- lay open along the wall Three, the installation of lamps means CS- chain sling DS- pipe hanger W- wall mounting C- suction top R- embedding S- stent CL- column Along the steel groove: SR Along the roof truss or cross roof: BE Along columns or columns: CLE Welded steel pipe laying: SC Conduit laying: MT Rigid plastic pipe laying: PC Flame retardant semi rigid PVC pipe laying: FPC Cable tray laying: CT Metal line laying: MR Laying of plastic groove: PR Laying with cables: M PVC insulated corrugated pipe laying: KPC Laying through metal hose: CP Direct Embedment: DB Cable trench laying: TC Mar

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档