建筑开槽(Building grooving).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑开槽(Building grooving)

建筑开槽(Building grooving) The description is not clear enough, I thought to the bottom of my heart Requirements for operating conditions for construction: 1. before the excavation of the earthwork, the underground and ground obstructions in the construction area shall be removed and disposed of according to the requirements of the construction plan. 2. buildings or structures or the location of the site of the control line (pile), the standard size of pile and the slot of the gray line, must pass the test; and after finishing pre screening procedures. 3. during the night construction, there should be enough lighting facilities; in danger areas, obvious signs should be set up and reasonable excavation order shall be arranged to prevent excavation or excavation. 4. when excavation of pit and ditch with underground water level, measures should be taken to reduce groundwater level according to local engineering geological data. Generally down to the excavation surface of 0.5m, and then excavation. 5. the road, bridge and unloading facilities after the construction machinery enter the site shall be inspected in advance and should be reinforced or widened when necessary. 6., select earthmoving machinery, should be based on the construction area of the terrain and operating conditions, soil classification and thickness, the total amount of work and duration of comprehensive consideration, in order to play the efficiency of construction machinery to determine, and compile the construction plan. 7. the construction area running route layout should be determined according to the engineering work area size, mechanical properties, distance and topography etc.. 8., in the mechanical construction can not work parts and trim slope slope, cleaning tank bottom and so on, should be equipped with manual. 9. familiar with drawings and technical clarification. Technological process: Determine the order and slope of excavation: sub layered, average excavation, trimming and bottom cleaning

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档