基础复习1(Foundation review 1).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
基础复习1(Foundation review 1)

基础复习1(Foundation review 1) 1, a known project equipment and instruments and equipment purchase fee of 10 million yuan, construction and installation costs 5 million 800 thousand yuan, other construction costs 2 million 400 thousand yuan, 1 million 500 thousand yuan price of basic reserve funds, reserve funds 500 thousand yuan, the construction period of 5 million yuan loan, construction loan interest 800 thousand yuan, the project is often the year of production of liquid assets, the average occupancy current liabilities amounted to 3 million 500 thousand yuan, the average occupancy amounted to 2 million 800 thousand yuan, the construction project total investment (million). A.2170 B.2450 C.2670 D.2950 Answer: A 2. The following is true about the unclear description of the project reserves. A. is used to compensate for unknown price increases until the end of the project B. is used to compensate for increased estimates arising from material, social, and economic changes C. is used to pay for items that may increase beyond the scope of your work D. is a potential project that can not be explicitly defined when estimating Answer: D 3. When calculating the original price of the non standard equipment made in China, the base of the profit should be (). A. material fee + processing fee + auxiliary material fee + dedicated tool fee + waste loss fee + packing fee B. material fee + processing fee + auxiliary material fee + dedicated tool fee + waste loss fee + purchase kit fee + packing fee C. material fee + processing fee + auxiliary material fee + dedicated tool fee + waste loss fee + purchase kit fee + packing fee + tax D. material fee + processing fee + auxiliary material fee + dedicated tool fee + waste loss fee + purchase kit fee + packing fee + tax + non-standard equipment design fee Answer: A 4. The original price of the imported equipment means (). A. FOB B. CIF price C. CIF D. dutiable value Answer: B 5, the following price and FOB meaning the same price is (). A.

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档