- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
基桩施工(Foundation pile construction)
基桩施工(Foundation pile construction)
Karst cave pretreatment scheme
Overview of the 1 program
The peripheral grouting method is adopted to increase the location of cavern and the strength of hole wall. The grouting hole is made of three layers of casing
The method is followed by the use of a 146mm sleeve at the outermost layer. The platform is inserted into the seabed sludge
The root stability of the casing is the principle. The middle casing is followed by a 127mm to the rock layer, and the depth of the rock is 30 ~
50cm. The innermost casing is drilled into the bottom of the cave at 1.0m depth by 91mm.
After drilling, the drilling slag is removed from the casing and inserted into the jet pipe to spray the high-pressure cement slurry.
2 main machinery and equipment
The main equipment and equipment for the pretreatment of pile foundation karst cave are shown in the following table.
Table 2-1 table of main machines and tools
Serial number name specification quantity remark
1 generator 300KW 6
2 rig 150KW 12 geological drill
3 crawler crane 50t 2 object machine transfer
4 mixing ship - 1
5 high pressure grouting machine - 2
6 freighters - 1
3 Efficacy Analysis
The pretreatment time mainly concentrates in the drilling construction process, and the single hole forming time is 1 days, each pile foundation cloth
3 drilling machines are installed, and the treatment time is 5 days for cave height 3.0m ~ 5.0m. The cave height is greater than 5.0m in the karst cave
The time is 10 days.
4 construction preparation
The site preparation: arrange the track in the casing, in accordance with the design of grouting hole cutting platform panel for drilling rig
Placement provides better working surfaces.
The raw materials and raw material inspection qualified rear can use.
The mix design: before the construction of the double liquid mixture ratio design, cement water cement ratio in the range of W/C
0.8:1 ~ 1:1, water glass: cement slurry (volume ratio) range from 5% to 20%. The slurry m
您可能关注的文档
- 品牌进化,松鹰腾飞新动力(Brand evolution, the new power to relax the eagle).doc
- 哈佛商学院要求学生必看的10部经典电影(The Harvard Business School requires 10 classic movies that students must see).doc
- 哈密地区煤矿(Hami coal mine).doc
- 哈哈哈啊哈哈(Ha ha ha ha ha ha ha!).doc
- 哈密瓜种植(Hami melon planting).doc
- 哈尔滨市创建全国文明城市知识100题(100 questions about the establishment of national civilized city knowledge in Harbin).doc
- 哈利波特_魁地奇世界杯决赛(Harry Porter _ Quidditch World Cup final).doc
- 哈尔滨市市民体育健身条例(Regulations of Harbin Municipality on sports fitness).doc
- 哈拉沟矿1#主斜井改造(Reconstruction of 1# main inclined shaft in).doc
- 哈理工网络基础题库4(Is the technical foundation network library 4).doc
- 塞林格在美国文学史上的地位(Salinger's position in the history of American Literature).doc
- 境界与实体——论中西传统哲学的一个差异(Realm and entity -- a difference between Chinese and Western Traditional Philosophy).doc
- 墙体 (共16本图集)(Wall (a total of 16 Atlas)).doc
- 墙布墙纸(Wallpaper wallpaper).doc
- 堪萨斯大学博物馆《天书》 《地书》 徐冰回顾展(The Museum of University of Kansas mumbo-jumbo book Xu Bing retrospective).doc
- 墙纸贴法(Wallpaper binding).doc
- 墙绘教程(Wall painting tutorial).doc
- 墙绘的材料(Wall painted material).doc
- 墙面工艺流程(Wall process).doc
- 墙面涂料乳胶漆(Wall paint, latex paint).doc
文档评论(0)