基桩施工(Foundation pile construction).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
基桩施工(Foundation pile construction)

基桩施工(Foundation pile construction) Karst cave pretreatment scheme Overview of the 1 program The peripheral grouting method is adopted to increase the location of cavern and the strength of hole wall. The grouting hole is made of three layers of casing The method is followed by the use of a 146mm sleeve at the outermost layer. The platform is inserted into the seabed sludge The root stability of the casing is the principle. The middle casing is followed by a 127mm to the rock layer, and the depth of the rock is 30 ~ 50cm. The innermost casing is drilled into the bottom of the cave at 1.0m depth by 91mm. After drilling, the drilling slag is removed from the casing and inserted into the jet pipe to spray the high-pressure cement slurry. 2 main machinery and equipment The main equipment and equipment for the pretreatment of pile foundation karst cave are shown in the following table. Table 2-1 table of main machines and tools Serial number name specification quantity remark 1 generator 300KW 6 2 rig 150KW 12 geological drill 3 crawler crane 50t 2 object machine transfer 4 mixing ship - 1 5 high pressure grouting machine - 2 6 freighters - 1 3 Efficacy Analysis The pretreatment time mainly concentrates in the drilling construction process, and the single hole forming time is 1 days, each pile foundation cloth 3 drilling machines are installed, and the treatment time is 5 days for cave height 3.0m ~ 5.0m. The cave height is greater than 5.0m in the karst cave The time is 10 days. 4 construction preparation The site preparation: arrange the track in the casing, in accordance with the design of grouting hole cutting platform panel for drilling rig Placement provides better working surfaces. The raw materials and raw material inspection qualified rear can use. The mix design: before the construction of the double liquid mixture ratio design, cement water cement ratio in the range of W/C 0.8:1 ~ 1:1, water glass: cement slurry (volume ratio) range from 5% to 20%. The slurry m

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档