回填土(Back fill).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
回填土(Back fill)

回填土(Back fill) Main construction method 6.1 construction process 6.1.1 fertilizer trough backfill: select soil, sieve soil, mix 2, 8 lime soil, ground cleaning, paving the first step, dust soil, 800 wide, shop the first step, soil, compaction, sampling, acceptance, paving, second steps, lime soil...... The last step of the paving is the lime soil, the width of the 800 width is paved outside, and the last step is the plain soil 6.1.2 garage roof backfill: soil selection, cleaning the base, laying the first step, soil, tamping, sampling, acceptance, paving second steps, soil and soil...... Paving the last step, lime soil, tamping, sampling and acceptance 6.1.3 the south side of the 46 axis and 47 axis external groove backfill: base cleaning, laying the first layer of concrete - vibrating - laying second layers of concrete...... Shop the last layer of concrete - vibrating 6.1.4 room core backfill: soil selection, cleaning the base, laying the first step, plain soil, tamping, sampling, acceptance, laying second steps, soil and soil...... The last step is to consolidate the soil, to consolidate the soil, to collect the sample, to examine and approve it, to sieve and mix 3: 7 lime soil, to pave the lime soil, to tamp the sample and to examine it 6.2 construction methods 6.2.1 trough backfill (except South Side) The 800 mm range of the backfill tank is 2 to 8 lime soil, and 800 mm is plain soil. The original soil backfill shall comply with the relevant provisions on the design requirements and construction specifications, before construction according to the specifications required to sift (backfill soil when the particle size is less than 50mm, dust particle size less than 20mm), should be kept in the soil sieving slot or dust must be in the groove on the mixing ratio; as the volume ratio of lime (2: 8), mixing lime soil must be standard bucket, strictly control the mix. Mix evenly at the same time, at least two times mixing; the original soil moisture content is too smal

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档