- 1、本文档共5页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
四等水准测量常识(Four level survey common sense)
四等水准测量常识(Four level survey common sense)
What is the allowable closing error for the four leveling survey? N (+ 6 V that right is the root, do not know how to play) + 20 (the number is the square root of root L, know how to play), how much? What do N and L stand for?
1.N represents the number of stations, L represents the distance (the unit is measured, such as your km) a closed with 9 stations, then the closure should be limited in 6*3=18mm, can also according to the location, if the distance is 1 kilometers, so should be limited in 20*1=20mm
Close the point elevation the starting elevation = true elevation difference
The algebraic sum of the height difference (back foot readings - front foot readings) of each measurement section
Observation elevation difference - true height difference = level measurement closure error
The adjustment principle of closing difference of closed and attached level route is that the sign of closing difference is directly proportional to the route length or station number, and is assigned to observation value of each elevation difference.
The adjustment principle of branch line level closure is averaged to measure and return the absolute value of the measured height as the height of the two values, and to measure the same symbol; then according to the starting point to Gao Cheng Gao Cheng segment average elevation calculation of each measuring point
(1) standard line of support
Figure 2-17 (a) branch line level is shown, along the same route from observation, observation due to and from the opposite direction, so to the height measurement and return measured the same absolute value but opposite sign, that is to measure the difference and sum of algebraic sum and difference of back measurement in theory should be equal to zero; but due to various errors in measurement, to measure the sum and difference algebraic sum and difference of back measurement is not equal to zero, which is the closed difference of height difference:
(2) closed le
您可能关注的文档
- 十大知名橱柜-西姆橱柜(Ten well-known cabinets - SIM cabinet).doc
- 十大最赚钱的职业(The ten most lucrative jobs).doc
- 十孔口琴教程(Ten hole harmonica lessons).doc
- 十年CAD制图经验(Ten years of CAD graphics experience).doc
- 十大路由设置(Ten routing settings).doc
- 十大职场最有用证书(Ten most useful certificates in the workplace).doc
- 十种反应力训练趣味游戏(Ten kinds of reaction force training interesting games).doc
- 十年后的建筑施工心得(Construction experience after ten years).doc
- 十部最具阅读价值的书(Ten books with the most reading value).doc
- 十种贵人,遇到了千万别放手(Ten noble met 10 million, do not let go).doc
- CECS306-2012 超高分子量聚乙烯钢骨架复合管管道施工及验收规程(含条文).pdf
- CECS224-2007 节能型双向集热卫浴间应用技术规程.pdf
- CECS337-2013 建筑给水纤维增强无规共聚聚丙烯复合管道工程技术规程.pdf
- CECS419-2015 中小型给水泵站设计规程.pdf
- CECS282-2010 建筑排水高密度聚乙烯(HDPE)管道工程技术规程.pdf
- CECS395-2015 胶圈电熔双密封聚乙烯复合供水管道工程技术规程(含条文).pdf
- CECS426-2016 减压型倒流防止器应用技术规程.pdf
- CECS403-2015 建筑排水不锈钢管道工程技术规程(含条文).pdf
- CECS219-2007 简易自动喷水灭火系统应用技术规程.pdf
- CECS237-2008 给水钢塑符合压力管管道工程技术规程(含条文小开本).pdf
最近下载
- GBT51051-2014 水资源规划规范.pdf VIP
- 岛津GC-2010操作维修手册.pdf
- 国家开放大学电大《基础写作》期末题库及答案.pdf VIP
- 肌力评定 等张、等长 等速.pdf VIP
- 普通高中英语课程标准(实验).pdf VIP
- 虚拟电厂VPP解决方案-.pptx VIP
- Abaqus三维岩石力学分析在Halliburton中国非常规油气开发实践中的应用研究实例.pdf VIP
- 新国家开放大学电大专科《基础写作》期末试题标准题库及答案(试卷号:2412).docx VIP
- 2025年宁夏大学辅导员招聘考试笔试参考题库附答案解析.docx VIP
- 北京理工大学应用光学课后题标准答案.doc VIP
文档评论(0)