- 1、本文档共21页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
空调常识问答71问(AirconditionercommonsenseQ
空调常识问答71问(Air conditioner common sense Q a 71 questions)
The calculation of the pipe diameter of exhaust ventilation and smoke exhaust is calculated according to the amount of exhaust smoke or the exhaust air volume When exhaust smoke, should the exhaust air be interlocked and closed? How to interlock? Is not should be devoted to the air?
The exhaust air and exhaust air volume should be calculated separately, and larger diameter calculation can be carried out. When exhaust smoke, the exhaust air outlet is best linked, and the smoke proof fireproof tuyere with 24V electric signal can be adopted.
1, general civil building air-conditioning how to determine the amount of excess moisture? How to determine the moisture quantity on restaurant meals?
The amount of air conditioning remaining humidity in general civil buildings is wet for human body. When the indoor temperature is 25 degrees, the dispersion rate is 61g/h (sitting state). The restaurant meals are wet and scattered according to the per capita 11.5g/h (usually Chinese restaurant).
2, you calculate air conditioning air supply is to check I-D chart method or simple method? With the check I-D graph method, the location of the points are often inaccurate, and the calculated values vary greatly. What can I do?
Of course, the use of software to calculate, such as Tongji out of the HVAC system is very good.
3, why winter heating with the radiator, do not consider fresh air, and do not consider dehumidification, and air-conditioning needs to be considered?
Without it, just because of economic problems, if the radiator with fresh air, humidification (not dehumidification) system, the effect is more satisfactory. Now there is the radiator system plus full heat exchanger, new air machine (including automatic humidifier) design, the use of good results.
4, why summer common air conditioning does not consider dehumidification, do not consider the new air conditioning, and the central air-conditioning is considered?
Just bec
您可能关注的文档
- 工作词汇(Working vocabulary).doc
- 工厂管理规章制度(Factory management rules and regulations).doc
- 工商银行网上贵金属t+d协议(ICBC precious metals t+d agreement Online).doc
- 工程测量试卷a卷期末试题(Engineering survey paper, a volume, final examination questions).doc
- 工程量清单与定额计价模式比较(Comparison of bill of quantities and fixed valuation model).doc
- 工程项目建设施工进度计划格式(Format of construction schedule for engineering projects).doc
- 巴菲特--我为何不看好美元(Buffett - why don't I look at the dollar).doc
- 工程预算知识(Engineering budget knowledge).doc
- 帕麦斯顿(palmerston).doc
- 带钢(Strip steel).doc
文档评论(0)