工程量清单与定额计价模式比较(Comparison of bill of quantities and fixed valuation model).docVIP

工程量清单与定额计价模式比较(Comparison of bill of quantities and fixed valuation model).doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程量清单与定额计价模式比较(Comparison of bill of quantities and fixed valuation model) Comparison of bill of quantities and fixed valuation model 2008-7-9 11:40 [big and small] [Print] [I want error correction] Project cost management is still in its infancy in China, although great progress has been made in recent years. But for the time being, there is still a big gap between Chinas project management and international standards. With the development of globalization, Chinas socialist market economic system has gradually improved, and the construction industry has gradually moved towards the market. The country needs to regulate new market rules urgently, and the cost of the project is facing a new reform. Especially after the accession to the WTO, large projects have become more and more, and the pricing rules under the planned economy system have been unable to adapt to international practice. In this paper, two main lines to illustrate the management of Engineering cost. One is the fixed valuation method under the planned economy. The price is formulated by the state in a unified way; the second is the construction cost management system under the market economy system; the market pricing method is adopted; the price is determined by the market. The definition, basic methods and procedures of the two valuation methods and the application in bidding are compared in detail to illustrate the necessity of the reform of the project cost in our country. A quota valuation model of construction project quota, is in accordance with the relevant national standards, product design planning and construction acceptance specifications, quality standards, and reference industry, local standards and construction process of representative engineering design and construction data to determine the completion of labor, material and machinery consumption consumption measurement the amount of the standard unit of product. Reflected in the level of development of social productive forces under t

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档