建筑工程法规案例(Cases of construction engineering regulations).docVIP

建筑工程法规案例(Cases of construction engineering regulations).doc

  1. 1、本文档共19页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑工程法规案例(Cases of construction engineering regulations)

建筑工程法规案例(Cases of construction engineering regulations) A construction company and a school signed a teaching building construction contract, clear construction units to quality and quantity, guarantee duration, complete the school teaching building construction task. After completion of the project, the Contractor submitted the completion report to the school. Schools in order not to affect the students in class, has not yet organized acceptance directly put into use. In the course of using, the school has found the quality problem existing in the teaching building and requested the construction unit to repair it. Construction units believe that the project without acceptance, the school early use of quality problems, construction units should not be held responsible. Ask 1., what are the three elements of the construction legal relationship in this case? Answer: in this case the construction legal relations main body is a construction company and a school. The object is the construction teaching building. The contents of the main obligations of both parties shall enjoy the rights and bear, specifically is a school in accordance with the contract, bear the full and timely payment of the obligations according to the contract, in the payment, the school will have the right to require the construction company to pay on time quality of teaching building. The right of the construction company is to obtain the project of the school. After enjoying the right, the construction company should undertake the obligation to deliver the qualified teaching building to the school on time and undertake the obligation of maintenance. 2, how should concrete analysis of the quality of the project responsibility and responsibility for the way, why? Answer: because the school was not completed in the case of acceptance, it was directly put into use, in violation of the completion of the project acceptance of the relevant laws and regulations. Therefore, the general quality problems shou

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档