- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
挑专项方案(Special programme)
挑专项方案(Special programme) This article is contributed by keviThe RTF document may not have a good browsing experience at the WAP end. It is recommended that you choose TXT, or download the source file to the native view. Construction scheme of suspended steel pipe scaffolding A, compiled on the basis of 1, the construction fastener type steel pipe scaffold safety technical specifications (JGJ130-2001) 2, the fourth edition of the construction manual 3, building construction safety inspection standards JGJ59-99-4, working in the construction of higher safety technical specifications (JGJ80-91) 5, specification for design of steel structures (GB50017-2003) 6, load code for the design of building structures (GB50009-2001) 7, the project construction drawings and design changes. Second, the project summary Three salt in the real estate development co., LTD., the development of salt in the building, the project designed by Beijing skyworth era architectural design co., LTD., project scope of four avenue, south to the sun sea moon road on the north, east to peace strand, Westwood irs, a total construction area 23099.98 ㎡; The height of the building is 85.6 m, one floor underground, 22 floors above ground, and the height of the floor is 4.5 m, the first layer is 5.1 m, the second layer is 3.9 m, the third layer is 3.6 m, the standard layer is 3.4 m, the top layer is 5.4 m, and the height of the equipment is 5.1 m. The engineering scaffold under 4 layer adopts temporary shelf (every) and the ground double row scaffolding, temporary use floor every shelf rack with pick, such as underground backfill is complete, decoration engineering Hours to 1-4 layer shall be built from the ground floor scaffolding, scaffolding landing riser pad under the 1000 * 250 * 50 board share concentration for the uniformly distributed load, other data like picking rack. From the 4th floor to the 22nd floor, the steel cantilevered frame is selected twice, on the fourth and 13th floors respe
您可能关注的文档
- 国内海绵城市建设三重误区(The domestic sponge city construction triple myth).doc
- 国外著名经济学家(Foreign famous economist).doc
- 国家地质公园生态旅游开发实例分析(Analysis of eco-tourism development in national geopark).doc
- 国家突发地质灾害应急预案.txt(National emergency plan for geological disasters. TXT).doc
- 国家职业资格考试-高级焊工模拟试题2(National vocational qualification exam - advanced welder simulation test 2).doc
- 国家精品课程——《微积分》建设的探索与实践(The exploration and practice of the construction of calculus, the national fine course).doc
- 国际..模拟题(International.. Simulation questions).doc
- 国际商法单选(International commercial law).doc
- 国际货运保险案例分析(International cargo insurance case analysis).doc
- 国际贸易理论演变(The evolution of international trade theory).doc
- 2025年吉林农业大学微生物学专业《微生物学》期末试卷及答案.docx
- 热点 12 研学旅行【讲练结合】(原卷版)-2026年中考英语新课标(核心素养)书面表达专题讲练(全国通用).docx
- 工艺污水处理厂的工艺与运行调试方案简述.pdf
- 2025年激光技术在光纤传感器市场调研报告.docx
- 2024-2025学年上海市铁岭中学三年级(下)科学期末试卷及答案.docx
- 工艺验证方案模板.pdf
- 热点 13 阳光大课间【讲练结合】(解析版)-2026年中考英语新课标(核心素养)书面表达专题讲练(全国通用).docx
- 工艺验证管理规程.pdf
- 热点 13 阳光大课间【讲练结合】(原卷版)-2026年中考英语新课标(核心素养)书面表达专题讲练(全国通用).docx
- 热点 14 低碳生活【讲练结合】 (原卷版)-2026年中考英语新课标(核心素养)书面表达专题讲练(全国通用).docx
有哪些信誉好的足球投注网站
文档评论(0)