- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
12市政冲刺题第三套(The third set of the municipal sprint)
12市政冲刺题第三套(The third set of the municipal sprint) In 2012, the first construction project of the 1st class was the third 1. Single item selection (total 20, 1 point for each item). Only 1 of the candidates in each question are most suitable for the topic. 1. The width of cement concrete pavement should be the same as the width of the roadbed, and its minimum thickness is () mm. 50 A. 80 B. 120 C. 150 D. 2. Suitable for traffic and driving frequency increase sharply, passenger transportation axle load increasing, the strict implementation of the one-way traffic divided urban main road and urban expressway of hot mix asphalt mixture is (). A. Modified asphalt mixture B. Asphalt mactellurite mixture C. Modified (asphalt) SMA D. Common asphalt mixture 3. Increase the strength of the lime stabilized soil along with age, and is closely related to the curing temperature, when the temperature is lower than () ℃ strength almost no growth. A.O 5 B. 8 C. 15 D. 4. Modified asphalt mixture pavement should not be used (). A. Tire roller B. Vibrating roller C. three wheel cylinder pressing road D. The cylinder roller compaction 5. The bridge with no horizontal force under vertical load is (). A. Suspension bridge B. Viaduct C. beam bridge D. arch bridge The steel band thickness of the metal screw tube should not be small to 0.3 mm. A. Aluminized material B. Manganese plated material C. Chromium plated material D. galvanizing material 7. In accordance with the different hoisting equipment, the erection method of the beam plate is different, and the erection method generally not included is (). A. Crane beam method B. Gantry crane girder method C. Through the bridge frame girder method D. Fixed gantry crane beam method 8. The construction of cap excavation is a form of Ming excavation, and the main difference between the construction and the common excavation method is (). A. the construction method is different from the effect B. construction methods and orders are different C. Con
您可能关注的文档
- +++共同的空气[赫兔]+++(+ + + common air [the hare] + +).doc
- 0 数据结构(0 data structure).doc
- 00铁发动机与铝发动机的区别(The difference between an iron engine and an aluminium engine).doc
- (转)美国人教你这样用Google,你真的会变特工~~~(Americans teach you to use Google, you really can change agents ~ ~).doc
- 0006 第6章集成运算(Chapter 6 integration operations).doc
- 010年温州市高三(Wenzhou city high 3).doc
- (强力推荐)大规模的海水运动(二)洋流对地理环境的影响((strong recommendation) large-scale seawater movement (ii) ocean currents affect the geographical environment).doc
- !异常的公式结尾(! Abnormal end formula).doc
- 07-08定向越野模拟试卷C(07-08 directional off-road simulation test C).doc
- 02消防监督检查规定(Fire control supervision and inspection regulations).doc
有哪些信誉好的足球投注网站
文档评论(0)